- Institution
- 경기도 광주시
- Department
- 의회사무국
○중앙정원 환경정비 개선공사경정
Programme 의회 시설 및 물품관리
Amounts and period
- Budgeted amount
- 9,800,000 KRW
- 기정액
- 10,000,000 KRW
- Change
- −200,000 KRW −2.0%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 의회사무국 2,042,144,000 KRW0.5%
-
Policy 지방의회 의정활동 지원 1,927,882,000 KRW0.5%
-
Programme 의정활동 및 의사운영 지원 1,927,882,000 KRW0.5%
-
Project 의회 시설 및 물품관리 230,479,000 KRW4.3%
-
Budget category 시설비및부대비 9,800,000 KRW100.0%
-
Statistical item 시설비 9,800,000 KRW100.0%
-
Item ○중앙정원 환경정비 개선공사경정 9,800,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○중앙정원 환경정비 개선공사 경정 9,800,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
3 itemsData source
-
Open source PDF
경기도 광주시 · FY2023 3회 추경 · 통합회계 · 2023년 제3회 추경 예산서
Opens in a new window
- Page
- 164 / 500
View source document details
- Document ID
doc_7mzrfee197t6jzj6g77r4r8w3f- Source document status
- Available
- File type
- application/pdf
- File size
- 3,147.567 KiB
- Location inside the source
- Page 164 Row 14 Line 2 Column level4
Source and reference
FY 2023 release No source record
- Fiscal year of record
- 2023
- Fetched from the source
- 2026-07-29 20:22
- Read and interpreted
- 2026-07-29 20:22
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_3vtky37xraj9a4dxc5t91t80c1- Address of this item
- /en/BudgetDetail/Item/bi_3vtky37xraj9a4dxc5t91t80c1
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “개선공사경정” · classification 401-01
- ○다람산공원 게이트볼장 개선공사경정 301,000,000 KRW −14.0%
- ◎어농3리 진입로 개선공사경정 48,021,000 KRW −12.7%
- ○병점1로 보행환경 개선공사경정 93,670,000 KRW −6.3%
- ○송산도시계획도로 대로3-1호선 개선공사경정 1,200,000,000 KRW +1,448.8%
- ○일동(화림선원 앞) 주차환경 개선공사경정 272,000,000 KRW −22.3%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.