- Institution
- 경기도 구리시
- Department
- 기획홍보담당관
○BSC 평가 결과보고서 제작
Programme BSC 기반 성과관리제도 운영
Amounts and period
- Budgeted amount
- 14,400,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 기획홍보담당관 11,768,084,000 KRW0.1%
-
Policy 지방행정 역량 강화(일반공공행정/일반행정) 1,348,460,000 KRW1.1%
-
Programme 시정운영 종합기획 및 BSC 성과관리 운영 133,500,000 KRW10.8%
-
Project BSC 기반 성과관리제도 운영 40,100,000 KRW35.9%
-
Budget category 일반운영비 35,600,000 KRW40.4%
-
Statistical item 사무관리비 35,600,000 KRW40.4%
-
Item ○BSC 평가 결과보고서 제작 14,400,000 KRW
- Category–statistical code
- 201-01
- Group
- Not provided in source
Original description
40,000원*180부*2회
Institution and programme names are shown as the original Korean source text.
Detailed budget items
5 itemsData source
-
Open source PDF
경기도 구리시 · FY2015 본예산 · 일반회계 · 2015년도-제2권 부서별 사업예산명세서
Opens in a new window
- Page
- 47 / 429
View source document details
- Document ID
doc_2mya5jzt1mw1by7cajnfkfgf5v- Source document status
- Available
- File type
- application/pdf
- File size
- 5,450.352 KiB
- Location inside the source
- Page 47 Row 3 Line 1 Column level4
Source and reference
FY 2015 release No source record
- Fiscal year of record
- 2015
- Fetched from the source
- 2026-07-29 20:02
- Read and interpreted
- 2026-07-29 20:02
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_3yj0h041r2a7tqa53e0mhe22zw- Address of this item
- /en/BudgetDetail/Item/bi_3yj0h041r2a7tqa53e0mhe22zw
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “결과보고서” · classification 201-01
- ○BSC 평가 결과보고서 제작 34,000원*100부 3,400,000 KRW
- ○BSC 평가 결과보고서 제작 14,400,000 KRW
- ●창의도시 평가 결과보고서 제작 15,000,000 KRW
- ◎연구조사 결과보고서 책자 제작 등 1,000,000 KRW
- ○사회조사 결과보고서 제작 6,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.