- Institution
- 경기도 안산시
- Department
- 교통정책과
○공공자전거(페달로) 철거 및 재활용 사업경정
Programme 자전거도로 등 인프라 구축사업
Amounts and period
- Budget amount
- 100,000,000 KRW
- 기정액
- 75,000,000 KRW
- Change
- +25,000,000 KRW +33.3%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 교통정책과 8,679,644,000 KRW1.2%
-
Policy 녹색교통 활성화 3,599,950,000 KRW2.8%
-
Programme 자전거이용활성화사업 836,323,000 KRW12.0%
-
Project 자전거도로 등 인프라 구축사업 162,450,000 KRW61.6%
-
Budget category 시설비및부대비 160,000,000 KRW62.5%
-
Statistical item 시설비 160,000,000 KRW62.5%
-
Item ○공공자전거(페달로) 철거 및 재활용 사업경정 100,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○공공자전거(페달로) 철거 및 재활용 사업 경정 100,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 안산시 · FY2022 1회 추경 · 일반회계 · 2022년도 제1회 추가경정 예산서(웹)
Opens in a new window
- Page
- 442 / 789
View source document details
- Document ID
doc_4yvc1z3bpv4tbyadpmmeawb9g4- Source document status
- Available
- File type
- application/pdf
- File size
- 20,057.646 KiB
- Location inside the source
- Page 442 Row 8 Line 1 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 20:19
- Read and interpreted
- 2026-07-29 20:19
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_3yp9929kksh8p4w2t2z3gfq149- Address of this item
- /en/BudgetDetail/Item/bi_3yp9929kksh8p4w2t2z3gfq149
Related records
Similar budgets
4 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “공공자전거” · classification 401-01
- ○공공자전거(페달로) 철거 및 재활용 사업 75,000,000 KRW
- ○공공자전거 스테이션 확대 설치(주민참여예산) 300,000,000 KRW
- ○공공자전거 스테이션 확대 설치(주민참여예산) 270,000,000 KRW −10.0%
- ○무인공공자전거 시스템(페달로) 구축(주민참여) 90,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.