- Institution
- 경기도 화성시
- Department
- 도로과
○수기~분천간 도로확포장공사경정
Programme 수기-분천간 도로확포장공사
Amounts and period
- Budgeted amount
- 4,200,000,000 KRW
- 기정액
- 2,900,000,000 KRW
- Change
- +1,300,000,000 KRW +44.8%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 51,160,409,000 KRW8.2%
-
Policy 도로망확충을 통한 교통체증 해소 23,272,394,000 KRW18.0%
-
Programme 시도 확ㆍ포장 15,811,504,000 KRW26.6%
-
Project 수기-분천간 도로확포장공사 4,450,000,000 KRW94.4%
-
Budget category 시설비및부대비 4,450,000,000 KRW94.4%
-
Statistical item 시설비 4,200,000,000 KRW100.0%
-
Item ○수기~분천간 도로확포장공사경정 4,200,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○수기~분천간 도로확포장공사 경정 4,200,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
-
Open source PDF
경기도 화성시 · FY2026 본예산 · 통합회계 · W_KI260410091611031
Opens in a new window
- Page
- 250 / 543
View source document details
- Document ID
doc_2jm5znq8jx9jkp25gans4kvhhw- Source document status
- Available
- File type
- application/pdf
- File size
- 4,030.663 KiB
- Location inside the source
- Page 250 Row 7 Line 2 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 20:38
- Read and interpreted
- 2026-07-29 20:38
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_492marmpm6k9ffged7jcwbevp8- Address of this item
- /en/BudgetDetail/Item/bi_492marmpm6k9ffged7jcwbevp8
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “도로확포장공사경정” · classification 401-01
- ○수기~분천간 도로확포장공사경정 8,300,000,000 KRW +23.9%
- ○수기~분천간 도로확포장공사경정 6,700,000,000 KRW +17.5%
- ○수기~분천간 도로확포장공사경정 2,500,000,000 KRW +150.0%
- ○시도27호선 도로확포장공사경정 100,000,000 KRW +100.0%
- ○마도205호선 도로확포장공사경정 100,000,000 KRW +100.0%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.