- Institution
- 경기도 포천시
- Department
- 도로과
○영중 도시계획도로(중로3-영중3)인도설치공사
Programme 영중 도시계획도로(중로3-영중3) 인도 설치공사
Amounts and period
- Budget amount
- 90,000,000 KRW
- 기정액
- 0 KRW
- Change
- +90,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Original and supplementary budgets by year
These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.
| Year | Original budget | Supplementary 3 | Year-on-year change |
|---|---|---|---|
| FY2026 | Amount unconfirmed | 90,000,000 KRW Selected | Not comparable |
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 77,776,664,000 KRW0.1%
-
Policy 도시개발 38,739,899,000 KRW0.2%
-
Programme 도시기반시설 구축사업 31,250,000,000 KRW0.3%
-
Project 영중 도시계획도로(중로3-영중3) 인도 설치공사 90,000,000 KRW100.0%
-
Budget category 시설비및부대비 90,000,000 KRW100.0%
-
Statistical item 시설비 90,000,000 KRW100.0%
-
Item ○영중 도시계획도로(중로3-영중3)인도설치공사 90,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○영중 도시계획도로(중로3-영중3)인도설치공 사
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 포천시 · FY2026 3회 추경 · 통합회계 · 2026년도 제3회 추가경정 예산서
Opens in a new window
- Page
- 386 / 534
- Document ID
doc_3yshyeqp3zx1jvk5n18vgmyyss- Source document status
- Available
- File type
- application/pdf
- File size
- 2,650.397 KiB
- Location inside the source
- Page 386 Row 9 Line 2 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-11-14 06:01
- Read and interpreted
- 2026-11-14 06:01
- Query snapshot refreshed
- 2026-11-16 09:32
- Item ID
bi_4hkkn8d89tnh3619d954v828ph- Address of this item
- /en/BudgetDetail/Item/bi_4hkkn8d89tnh3619d954v828ph
Related records
Similar budgets
5 itemsKeyword “도시계획도로” · classification 401-01
- ○백석 도시계획도로 개설사업(중로3-서25호선)(대희파인빌) 경정 400,000,000 KRW −11.1%
- ○노면불량 도시계획도로 재포장공사 1,000,000,000 KRW +33.3%
- ○내촌 도시계획도로(대로3-내촌1) 유지관리 공사 100,000,000 KRW
- ○삼산리 도시계획도로(소로1-6)정비공사 37,849,000 KRW −36.9%
- ○죽전리 도시계획도로(중로 2-11) 연결공사 189,941,000 KRW −36.7%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.