- Institution
- 충청북도 청주시
- Department
- 흥덕구 건설교통과
◎청주역사거리~광역매립장간 도로덧씌우기공사 (L=1,857m, B=3.5m)
Programme 도로정비 및 유지보수
Amounts and period
- Budget amount
- 113,383,000 KRW
- 기정액
- 130,000,000 KRW
- Change
- −16,617,000 KRW −12.8%
Original and supplementary budgets by year
These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.
| Year | Original budget | Supplementary 1 | Supplementary 3 | Year-on-year change |
|---|---|---|---|---|
| FY2017 | Amount unconfirmed | 130,000,000 KRW | 113,383,000 KRW Selected | Not comparable |
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 흥덕구 건설교통과 18,989,355,000 KRW0.6%
-
Policy 지역균형발전위한 도시기반조성 12,591,382,000 KRW0.9%
-
Programme 도로관리 10,047,008,000 KRW1.1%
-
Project 도로정비 및 유지보수 5,970,459,000 KRW1.9%
-
Budget category 시설비및부대비 5,853,283,000 KRW1.9%
-
Statistical item 시설비 5,838,993,000 KRW1.9%
-
Item ◎청주역사거리~광역매립장간 도로덧씌우기공사 (L=1,857m, B=3.5m) 113,383,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
◎청주역사거리~광역매립장간 도로덧씌우기공사 (L=1,857m, B=3.5m) 113,383,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
20 items- ◎청주역사거리~광역매립장간 도로덧씌우기공사 (L=1,857m, B=3.5m) 113,383,000 KRW Opens in a new window
- ◎통신요금 7,920,000 KRW Opens in a new window
- ○도로관리 CCTV회선 사용료(경찰청 CCTV) 4,800,000 KRW Opens in a new window
- ◎한성아파트 주변 보도정비공사(L=270m, B=4.0~5.0m) 68,489,000 KRW Opens in a new window
- ◎복대동 복대파출소 주변 보도정비공사(L=160m, B=3.5m) 31,060,000 KRW Opens in a new window
- ◎제2순환로(청주MBC~시외버스터미널) 도로덧씌우기공사(L=700m, B=10.0m) 136,318,000 KRW Opens in a new window
- ◎만수사거리~쌍청삼거리간 도로덧씌우기공사(L =1,200m, B=3.5m) 80,510,000 KRW Opens in a new window
- ◎백봉로 도로덧씌우기공사(L=1,500m, B=9.0m) 146,939,000 KRW Opens in a new window
- ◎충북대 정문~현대아파트간 보도정비공사(L=200m, B=3.0m) 30,790,000 KRW Opens in a new window
- ◎대성중학교 후문 인도설치공사(L=100m,B=2.0m) 44,231,000 KRW Opens in a new window
- ◎흥덕초교 주변 계단 및 보도정비공사(3개소) 57,700,000 KRW Opens in a new window
- ◎운천초등학교 주변 보도정비공사(L=170m,B=2.0m) 27,304,000 KRW Opens in a new window
- ◎제2순환로(하이닉스~충청에너지서비스간) 도 321,245,000 KRW Opens in a new window
- ◎직지대로(한국공예관~봉명사거리) 도로덧씌우기공사(L=1,000m, B=10~24.0m) 209,828,000 KRW Opens in a new window
- ◎직지대로(킹텍스~봉정사거리) 도로덧씌우기공사(L=928m, B=7.0m) 120,139,000 KRW Opens in a new window
- ◎발산교~가경초등학교간 도로덧씌우기공사(L=660m, B=13m) 157,078,000 KRW Opens in a new window
- ◎산업단지육거리~세종테크노벨리간 도로덧씌우기공사(L=714m, B=7.0m) 92,815,000 KRW Opens in a new window
- ◎가경로(덕일아파트~삼일아파트)외 4개소 차선분리대설치공사 89,250,000 KRW Opens in a new window
- ◎가로수로 조달청 앞 미끄럼방지시설(그루빙) 설치공사(L=220m, B=7m) 17,870,000 KRW Opens in a new window
- ◎관내 도로안내표지판 정비공사(13개소) 13,690,000 KRW Opens in a new window
Data source
- Document ID
doc_5yg2v6k96h50qhqcrzdaqach4r- Source document status
- Available
- File type
- application/pdf
- File size
- 364.001 KiB
- Location inside the source
- Page 15 Row 2 Line 12 Column level4
Source and reference
FY 2017 release No source record
- Fiscal year of record
- 2017
- Fetched from the source
- 2026-07-29 17:50
- Read and interpreted
- 2026-07-29 17:50
- Query snapshot refreshed
- 2026-11-16 11:44
- Item ID
bi_4hra2yd3emy9twy7mh1tap3xdw- Address of this item
- /en/BudgetDetail/Item/bi_4hra2yd3emy9twy7mh1tap3xdw
Related records
Similar budgets
5 itemsKeyword “도로덧씌우기공사” · classification 401-01
- ◎만수사거리~쌍청삼거리간 도로덧씌우기공사(L =1,200m, B=3.5m) 80,510,000 KRW −4.2%
- ◎신촌동 도로덧씌우기공사(L=300m, B=3~5.0m)(16년 특별조정교부금) 18,370,000 KRW −8.2%
- ◎직지대로(한국공예관~봉명사거리) 도로덧씌우기공사(L=1,000m, B=10~24.0m) 209,828,000 KRW −4.6%
- ◎백봉로 도로덧씌우기공사(L=1,500m, B=9.0m) 146,939,000 KRW −27.4%
- ○장전마을(태장동 1949-1번지 일원) 도로덧씌우기공사(L=30m, B=5m) 35,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.