- Institution
- 강원특별자치도 평창군
- Department
- 도시과
ㅇ횡계 중로2-7호 도로개설공사
Programme 도시계획도로개설
Amounts and period
- Budget amount
- 500,000,000 KRW
- 기정액
- 0 KRW
- Change
- +500,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도시과 39,553,202,000 KRW1.3%
-
Policy 도시개발 32,730,234,000 KRW1.5%
-
Programme 도시인프라 확충 29,107,803,000 KRW1.7%
-
Project 도시계획도로개설 2,702,000,000 KRW18.5%
-
Budget category 시설비및부대비 2,702,000,000 KRW18.5%
-
Statistical item 시설비 2,700,000,000 KRW18.5%
-
Item ㅇ횡계 중로2-7호 도로개설공사 500,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
4 itemsData source
-
Open source PDF
강원특별자치도 평창군 · FY2026 2회 추경 · 통합회계 · budget_2026_2_7
Opens in a new window
- Page
- 71 / 146
- Document ID
doc_0x140zspk8a34539ra4dnb2ara- Source document status
- Available
- File type
- application/pdf
- File size
- 1,506.168 KiB
- Location inside the source
- Page 71 Row 6 Line 5 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-11-14 05:58
- Read and interpreted
- 2026-11-14 05:58
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_4hsbnt01sc3352v40m0170m0eh- Address of this item
- /en/BudgetDetail/Item/bi_4hsbnt01sc3352v40m0170m0eh
Related records
Similar budgets
5 itemsKeyword “도로개설공사” · classification 401-01
- ㅇ횡계 중로2-6호 도로개설공사 500,000,000 KRW
- ◎발산천 일원 도로개설공사(중로2-446) 60,000,000 KRW
- ㅇ봉평 소로2-18호 도로개설공사 300,000,000 KRW
- ◎율량동 중리마을 도로개설공사(L=102m, B=16m) 91,000,000 KRW
- ○검단2지구(소-22호선) 도로개설공사 120,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.