- Institution
- 인천광역시 강화군
- Department
- 불은면
○삼성2리(904-7번지 일원) 마을안길 정비공사(L=66m,B=1.5m)
Programme 불은면 마을안길포장
Amounts and period
- Budgeted amount
- 15,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 불은면 1,463,919,000 KRW1.0%
-
Policy 불은면 사업경비 1,265,104,000 KRW1.2%
-
Programme 지역사회개발 730,000,000 KRW2.1%
-
Project 불은면 마을안길포장 176,000,000 KRW8.5%
-
Budget category 시설비및부대비 176,000,000 KRW8.5%
-
Statistical item 시설비 176,000,000 KRW8.5%
-
Item ○삼성2리(904-7번지 일원) 마을안길 정비공사(L=66m,B=1.5m) 15,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○삼성2리(904-7번지 일원) 마을안길 정비공사( L=66m,B=1.5m) 15,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
6 items- ○삼성2리(904-7번지 일원) 마을안길 정비공사(L=66m,B=1.5m) 15,000,000 KRW Opens in a new window
- ○고능1리(821-1번지 일원) 게이트볼장 진입로 22,000,000 KRW Opens in a new window
- ○넙성리(740번지 일원) 아스콘 포장공사(L=280m,B=4.8~5m) 39,000,000 KRW Opens in a new window
- ○덕성리(972번지 일원) 아스콘 포장공사(L=400m,B=4.5m) 50,000,000 KRW Opens in a new window
- ○삼동암1리(1072-17번지 일원) 아스콘 재포장공사(L=350m,B=3.3~3.5m) 35,000,000 KRW Opens in a new window
- ○삼동암2리(1370번지 일원) 가드레일 설치공사(L=148m) 15,000,000 KRW Opens in a new window
Data source
-
Open source PDF
인천광역시 강화군 · FY2025 본예산 · 일반회계 · 7._세출예산사업명세서(일반회계)
Opens in a new window
- Page
- 638 / 723
- Document ID
doc_6ahcq1z6j4db86e076914dqxxh- Source document status
- Available
- File type
- application/pdf
- File size
- 6,940.848 KiB
- Location inside the source
- Page 638 Row 13 Line 13 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 19:01
- Read and interpreted
- 2026-07-29 19:01
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_4kjp5nnh461mg5w1kt7qptdbf0- Address of this item
- /en/BudgetDetail/Item/bi_4kjp5nnh461mg5w1kt7qptdbf0
Related records
Similar budgets
5 itemsKeyword “삼성2리” · classification 401-01
- ○삼성2리(904-7번지 일원) 마을안길 정비공사(L=66m,B=1.5m) 15,000,000 KRW
- ○삼성2리(1008번지 일원) 마을안길 확포장공사(L=260m,B=1m,H=1.5m) 경정 0 KRW −100.0%
- ○삼성2리(1008번지 일원) 마을안길 확포장공사(L=260m,B=1m,H=1.5m) 70,000,000 KRW
- ○삼성2리(1008번지 일원) 마을안길 확포장공사(L=260m,B=1m,H=1.5m) 70,000,000 KRW
- ○삼성2리(775-145번지 일원) 마을안길 정비공사(L=30m,B=3.5m) 15,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.