- Institution
- 충청북도
- Department
- 도로과
○제6차 국도국지도 건설계획 대응 사전타당성조사 용역
Programme 제6차 국도국지도 건설계획 대응 사전타당성조사 용역
Amounts and period
- Budget amount
- 110,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 82,524,517,000 KRW0.1%
-
Policy 편리하고 안전한 도로망 구축 58,474,153,000 KRW0.2%
-
Programme 지역현안 연결도로망 구축 110,000,000 KRW100.0%
-
Project 제6차 국도국지도 건설계획 대응 사전타당성조사 용역 110,000,000 KRW100.0%
-
Budget category 시설비및부대비 110,000,000 KRW100.0%
-
Statistical item 시설비 110,000,000 KRW100.0%
-
Item ○제6차 국도국지도 건설계획 대응 사전타당성조사 용역 110,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○제6차 국도국지도 건설계획 대응 사전타당 성조사 용역
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
충청북도 · FY2025 본예산 · 일반회계 · 06-1-2.세출예산사업명세서(일반회계)
Opens in a new window
- Page
- 439 / 822
- Document ID
doc_696tv70sr9qbtq1bj4bdqxhn20- Source document status
- Available
- File type
- application/pdf
- File size
- 8,264.269 KiB
- Location inside the source
- Page 439 Row 18 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 19:05
- Read and interpreted
- 2026-07-29 19:05
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_4m3bvcd4859ghvphhgp5mka9ed- Address of this item
- /en/BudgetDetail/Item/bi_4m3bvcd4859ghvphhgp5mka9ed
Related records
Similar budgets
5 itemsKeyword “사전타당성조사” · classification 401-01
- ○제6차 국도국지도 건설계획 대응 사전타당성조사 용역 110,000,000 KRW
- ○새솔동~안산 연결도로 사전타당성조사 용역 22,000,000 KRW
- ○공공골프장 조성사업 사전타당성조사 및기본계획수립 용역 216,430,000 KRW −13.4%
- ○공공골프장 조성사업 사전타당성조사 및기본계획수립 용역 250,000,000 KRW
- ○장화리~여차리 언덕 낮추기 사업 사전타당성조사 용역 100,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.