- Institution
- 경기도 양주시
- Department
- 도로과
○백석 도시계획도로(소로2-서62) 개설사업(읍사무소)
Programme 백석 도시계획도로(소로2-서62) 개설사업(읍사무소)
Amounts and period
- Budget amount
- 1,380,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 36,451,730,000 KRW3.8%
-
Policy 시도 도로망 확충 15,320,500,000 KRW9.0%
-
Programme 도시계획도로 개설 12,617,000,000 KRW10.9%
-
Project 백석 도시계획도로(소로2-서62) 개설사업(읍사무소) 1,380,000,000 KRW100.0%
-
Budget category 시설비및부대비 1,380,000,000 KRW100.0%
-
Statistical item 시설비 1,380,000,000 KRW100.0%
-
Item ○백석 도시계획도로(소로2-서62) 개설사업(읍사무소) 1,380,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○백석 도시계획도로(소로2-서62) 개설사업(읍 사무소) 1,380,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
- Document ID
doc_3mceyhj74ysnne9jkmb8zbcpxe- Source document status
- Available
- File type
- application/pdf
- File size
- 9,122.216 KiB
- Location inside the source
- Page 557 Row 12 Line 2 Column level4
Source and reference
FY 2023 release No source record
- Fiscal year of record
- 2023
- Fetched from the source
- 2026-07-29 20:24
- Read and interpreted
- 2026-07-29 20:24
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_4mhpddfd6903tccpb9yyxksyy2- Address of this item
- /en/BudgetDetail/Item/bi_4mhpddfd6903tccpb9yyxksyy2
Related records
Similar budgets
5 itemsKeyword “도시계획도로” · classification 401-01
- ◎현대아파트~세광아파트 간 도시계획도로(소로2-170) 개설 300,000,000 KRW
- ◎도시계획도로 측량수수료(5개소) 0 KRW −100.0%
- ○삼산리 도시계획도로(소로1-6)정비공사 37,849,000 KRW −36.9%
- ◎홍성 북서부순환 도시계획도로 개설 6,646,000,000 KRW +44.5%
- ○죽전리 도시계획도로(중로 2-11) 연결공사 189,941,000 KRW −36.7%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.