- Institution
- 경상북도 울진군
- Department
- 울진읍
○정림3리(나그네골)농로개선공사(L=10m)
Programme 소규모주민숙원사업
Amounts and period
- Budgeted amount
- 30,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 울진읍 1,245,540,000 KRW2.4%
-
Policy 행정서비스강화(울진읍) 889,433,000 KRW3.4%
-
Programme 주민숙원사업 해결 440,000,000 KRW6.8%
-
Project 소규모주민숙원사업 440,000,000 KRW6.8%
-
Budget category 시설비및부대비 440,000,000 KRW6.8%
-
Statistical item 시설비 400,000,000 KRW7.5%
-
Item ○정림3리(나그네골)농로개선공사(L=10m) 30,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
19 items- ○정림3리(나그네골)농로개선공사(L=10m) 30,000,000 KRW Opens in a new window
- ○온양1리(온곤골)농로포장공사(L=160m) 25,000,000 KRW Opens in a new window
- ○연지2리(봉오)마을안길 가드레일설치공사(L=50m) 15,000,000 KRW Opens in a new window
- ○읍내2리 마을안길 정비공사(A=270㎡) 15,000,000 KRW Opens in a new window
- ○호월2리(심경골)농로포장공사(L=100m) 20,000,000 KRW Opens in a new window
- ○명도1리(수재골)농로포장공사(L=110m) 20,000,000 KRW Opens in a new window
- ○호월1리 마을안길 확장공사(L=10m) 15,000,000 KRW Opens in a new window
- ○고성2리(가원동)마을안길 포장공사(L=50m) 10,000,000 KRW Opens in a new window
- ○신림리(본동)배수로 설치공사(L=60m) 25,000,000 KRW Opens in a new window
- ○정림1리(곰치골)배수로 정비공사(L=40m) 30,000,000 KRW Opens in a new window
- ○정림2리(건너골)마을안길 확장공사(L=20m) 30,000,000 KRW Opens in a new window
- ○읍남1리(하토일)배수로 설치공사(L=80m) 30,000,000 KRW Opens in a new window
- ○읍남4리(봉림재)배수개선공사(L=45m) 15,000,000 KRW Opens in a new window
- ○호월3리 마을안길 배수개선공사(L=15m) 20,000,000 KRW Opens in a new window
- ○연지3리(본동)마을안길 확장공사(A=280㎡) 20,000,000 KRW Opens in a new window
- ○대흥리(미파골)마을안길 포장공사(L=120m) 25,000,000 KRW Opens in a new window
- ○고성2리(귀골)배수로 설치공사(L=45m) 25,000,000 KRW Opens in a new window
- ○소규모주민숙원사업 실시설계비 30,000,000 KRW Opens in a new window
- ○장비임차료 40,000,000 KRW Opens in a new window
Data source
View source document details
- Document ID
doc_4nkt8rwctdczm1z3ms20931hdp- Source document status
- Available
- File type
- application/pdf
- File size
- 159.003 KiB
- Location inside the source
- Page 1 Row 8 Line 10 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 18:27
- Read and interpreted
- 2026-07-29 18:27
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_4phwtwmsns54355xv9z38khpjr- Address of this item
- /en/BudgetDetail/Item/bi_4phwtwmsns54355xv9z38khpjr
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “농로개선공사” · classification 401-01
AI analysis report
AI analysis reports are not yet available.