- Institution
- 인천광역시
- Department
- 노인정책과
○인천가족공원 조성사업(3-2단계) 경정
Programme 인천가족공원 조성사업(3-2단계)
Amounts and period
- Budget amount
- 25,124,000,000 KRW
- 기정액
- 34,002,384,000 KRW
- Change
- −8,878,384,000 KRW −26.1%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 노인정책과 1,918,220,000,000 KRW1.3%
-
Policy 맞춤형 노인복지 1,916,709,137,000 KRW1.3%
-
Programme 장사문화 개선 26,536,110,000 KRW94.7%
-
Project 인천가족공원 조성사업(3-2단계) 25,124,000,000 KRW100.0%
-
Budget category 시설비및부대비 25,124,000,000 KRW100.0%
-
Statistical item 시설비 25,124,000,000 KRW100.0%
-
Item ○인천가족공원 조성사업(3-2단계) 경정 25,124,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○인천가족공원 조성사업(3-2단계) 경정 25,124,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
인천광역시 · FY2025 1회 추경 · 일반회계 · 3-3. 세출예산사업명세서(여성가족국)
Opens in a new window
- Page
- 13 / 31
View source document details
- Document ID
doc_2517y0ftpnxdn7khcr4c6bdn3d- Source document status
- Available
- File type
- application/pdf
- File size
- 390.257 KiB
- Location inside the source
- Page 13 Row 4 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 19:01
- Read and interpreted
- 2026-07-29 19:25
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_4qf7726sqppzz8etzpk9hds0dz- Address of this item
- /en/BudgetDetail/Item/bi_4qf7726sqppzz8etzpk9hds0dz
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “인천가족공원” · classification 401-01
- ○인천가족공원 조성사업(3-2단계) 경정 25,124,000,000 KRW −26.1%
- ○인천가족공원 조성사업(3-2단계) 34,002,384,000 KRW
- ○인천가족공원 조성사업(3-2단계) 34,002,384,000 KRW
- ○인천가족공원 조성사업(3-2단계) 1,800,000,000 KRW
- ○인천가족공원 조성사업(3-3단계) 건축기획 용역 80,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.