- Institution
- 경기도 고양시
- Department
- 도로관리사업소 공사과
○공사비 경정 2,200,000,000원
Programme 사리현IC주변(시도82호선) 도로개설공사
Amounts and period
- Budget amount
- 2,200,000,000 KRW
- 기정액
- 500,000,000 KRW
- Change
- +1,700,000,000 KRW +340.0%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로관리사업소 공사과 55,243,310,000 KRW4.0%
-
Policy 일반도로건설(교통및물류/도로) 41,301,000,000 KRW5.3%
-
Programme 도로확포장 11,878,000,000 KRW18.5%
-
Project 사리현IC주변(시도82호선) 도로개설공사 2,200,000,000 KRW100.0%
-
Budget category 시설비및부대비 2,200,000,000 KRW100.0%
-
Statistical item 시설비 2,200,000,000 KRW100.0%
-
Item ○공사비 경정 2,200,000,000원 2,200,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 고양시 · FY2022 2회 추경 · 통합회계 · 2022년도 제2회 추가경정예산서_최종
Opens in a new window
- Page
- 354 / 480
View source document details
- Document ID
doc_4qhqwyb6ms3x3e74b1730hy8da- Source document status
- Available
- File type
- application/pdf
- File size
- 10,056.783 KiB
- Location inside the source
- Page 354 Row 17 Line 1 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 20:19
- Read and interpreted
- 2026-07-29 20:19
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_4v26rbbyxzz48azwnqvws85cf4- Address of this item
- /en/BudgetDetail/Item/bi_4v26rbbyxzz48azwnqvws85cf4
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “공사비” · classification 401-01
- ○공사비 380,000,000원 380,000,000 KRW
- ◎공사비 3,905,000,000원 3,905,000,000 KRW −5.1%
- ○공사비 935,000,000원 935,000,000 KRW
- ○공사비 380,000,000원 380,000,000 KRW
- ◎공사비 1,600,000,000원 1,600,000,000 KRW +433.3%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.