- Institution
- 서울특별시
- Department
- 재난안전관리실 도로계획과
ㅇ 공사비
Programme 동부간선도로 지하화(재정구간)
Amounts and period
- Budgeted amount
- -5,000,100,000 KRW
- 기정액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 재난안전관리실 도로계획과 343,247,901,000 KRW
-
Policy 도로 건설 326,569,340,000 KRW
-
Programme 간선도로망 확충(도시개발특별) 271,075,713,000 KRW
-
Project 동부간선도로 지하화(재정구간) 10,738,000,000 KRW
-
Budget category 시설비및부대비 Present in the source but not extracted
-
Statistical item 시설비 -5,000,100,000 KRW
-
Item ㅇ 공사비 -5,000,100,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
-5,000,100,000원 = △5,000,100
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
-
Open source PDF
서울특별시 · FY2023 1회 추경 · 통합회계 · 64af8189a1f834.77358534
Opens in a new window
- Page
- 377 / 503
- Document ID
doc_6x2x91w18yhce8357znswp3vfa- Source document status
- Available
- File type
- application/pdf
- File size
- 12,663.792 KiB
- Location inside the source
- Page 377 Row 4 Line 13 Column page_text
Source and reference
FY 2023 release No source record
- Fiscal year of record
- 2023
- Fetched from the source
- 2026-07-29 20:24
- Read and interpreted
- 2026-07-29 20:24
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_4v4dkf0fwdnphqfey652m59b3m- Address of this item
- /en/BudgetDetail/Item/bi_4v4dkf0fwdnphqfey652m59b3m
Related records
Similar budgets
5 itemsKeyword “공사비” · classification 401-01
- ○공사비 380,000,000원 380,000,000 KRW
- ◎공사비 3,905,000,000원 3,905,000,000 KRW −5.1%
- ○공사비 935,000,000원 935,000,000 KRW
- ○ 새천년 해안도로 해파랑 감성공원 조성 공사비 2,302,000,000 KRW −17.9%
- ○공사비 478,652,000원 478,652,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.