- Institution
- 경상북도 성주군
- Department
- 수륜면
○오천2리(부미)마을진입로정비공사(L=200m)
Programme 소규모주민숙원사업(주민참여예산)
Amounts and period
- Budgeted amount
- 20,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 수륜면 1,774,237,000 KRW1.1%
-
Policy 일선행정운영및주민생활편익구축 1,564,720,000 KRW1.3%
-
Programme 주민숙원사업 830,000,000 KRW2.4%
-
Project 소규모주민숙원사업(주민참여예산) 830,000,000 KRW2.4%
-
Budget category 시설비및부대비 830,000,000 KRW2.4%
-
Statistical item 시설비 830,000,000 KRW2.4%
-
Item ○오천2리(부미)마을진입로정비공사(L=200m) 20,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
20,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
29 items- ○오천2리(부미)마을진입로정비공사(L=200m) 20,000,000 KRW Opens in a new window
- ○백운1리(우수동)배수로정비공사(L=100m) 30,000,000 KRW Opens in a new window
- ○백운2리(중기)세천정비공사(L=50m) 30,000,000 KRW Opens in a new window
- ○신파1리(만지)배수로정비공사(L=100m) 30,000,000 KRW Opens in a new window
- ○적송1리(적송)마을진입로아스콘덧씌우기공사(L=200m) 30,000,000 KRW Opens in a new window
- ○적송2리(학동)배수로정비공사(L=100m) 25,000,000 KRW Opens in a new window
- ○봉양1리(새목)마을주차장정비공사(1식) 30,000,000 KRW Opens in a new window
- ○봉양2리(백양골)마을안길정비공사(L=50m) 25,000,000 KRW Opens in a new window
- ○신정리(임천)마을안길아스콘덧씌우기공사(L=200m) 30,000,000 KRW Opens in a new window
- ○수성1리(가람)세천정비공사(L=50m) 30,000,000 KRW Opens in a new window
- ○수성2리(갓말)농로정비공사(L=150m) 25,000,000 KRW Opens in a new window
- ○송계1리(황새봉)세천정비공사(L=50m) 30,000,000 KRW Opens in a new window
- ○송계2리(솔산)농로정비공사(L=150m) 25,000,000 KRW Opens in a new window
- ○수륜리(서원골)배수로정비공사(L=150m) 30,000,000 KRW Opens in a new window
- ○수륜리(윤동)황토길정비공사(1식) 30,000,000 KRW Opens in a new window
- ○성1리(개차)농로확포장공사(L=100m) 30,000,000 KRW Opens in a new window
- ○성2리(성동)배수로정비공사(L=200m) 25,000,000 KRW Opens in a new window
- ○오천1리(사창)마을진입로정비공사(1식) 30,000,000 KRW Opens in a new window
- ○계정1리(중마)마을안길아스콘덧씌우기공사 (L=200m) 30,000,000 KRW Opens in a new window
- ○계정2리(원기)농로정비공사(L=50m) 30,000,000 KRW Opens in a new window
- ○남은1리(법산)배수로정비공사(L=200m) 25,000,000 KRW Opens in a new window
- ○남은2리(작천)배수로정비공사(L=100m) 30,000,000 KRW Opens in a new window
- ○보월1리(탑안)배수로정비공사(L=100m) 30,000,000 KRW Opens in a new window
- ○보월2리(웃마찔)농로정비공사(L=100m) 30,000,000 KRW Opens in a new window
- ○작은리(삼거리)세천정비공사(L=50m) 30,000,000 KRW Opens in a new window
- ○소규모주민숙원사업설계용역 40,000,000 KRW Opens in a new window
- ○소규모주민숙원사업긴급정비비(상반기) 40,000,000 KRW Opens in a new window
- ○가로등(보안등)설치 20,000,000원 20,000,000 KRW Opens in a new window
- ○재해우려목정비비 20,000,000원 20,000,000 KRW Opens in a new window
Data source
- Document ID
doc_5nbm5daggfxz5fys8v404jps4n- Source document status
- Available
- File type
- application/pdf
- File size
- 118.769 KiB
- Location inside the source
- Page 1 Row 7 Line 36 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 19:08
- Read and interpreted
- 2026-07-29 19:08
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_4z5rts3d8kjq4xh756d1twczab- Address of this item
- /en/BudgetDetail/Item/bi_4z5rts3d8kjq4xh756d1twczab
Related records
Similar budgets
5 itemsKeyword “마을진입로정비공사” · classification 401-01
- ○오천2리(부미)마을진입로정비공사(L=200m) 30,000,000 KRW
- ○오천2리(부미)마을진입로정비공사(L=200m) 27,900,000 KRW −7.0%
- ○오천2리(부미)마을진입로정비공사(L=200m) 30,000,000 KRW
- ○취곡2리(방아실)마을진입로정비공사(L=200m) 30,000,000 KRW
- ○외기2리(외원)마을진입로정비공사(L=90m) 30,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.