- Institution
- 제주특별자치도
- Department
- 제주시도시계획과
○부림랜드~1100도로(중로1-1-47) 도시계획도로개설사업
Programme 부림랜드~1100도로(중로1-1-47) 도시계획도로 개설사업
Amounts and period
- Budgeted amount
- 3,095,000,000 KRW
- 기정액
- 2,095,000,000 KRW
- Change
- +1,000,000,000 KRW +47.7%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 제주시도시계획과 208,751,318,000 KRW1.5%
-
Policy 공공기반시설계획및확충(국토및지역개발/지역및도시) 208,688,236,000 KRW1.5%
-
Programme 도시계획도로확충 45,104,400,000 KRW6.9%
-
Project 부림랜드~1100도로(중로1-1-47) 도시계획도로 개설사업 3,100,000,000 KRW99.8%
-
Budget category 시설비및부대비 3,100,000,000 KRW99.8%
-
Statistical item 시설비 3,095,000,000 KRW100.0%
-
Item ○부림랜드~1100도로(중로1-1-47) 도시계획도로개설사업 3,095,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○부림랜드~1100도로(중로1-1-47) 도시계획도로 개설사업
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
제주특별자치도 · FY2021 3회 추경 · 의료급여기금운영특별회계 · 2021년 3회추경 예산서
Opens in a new window
- Page
- 380 / 886
View source document details
- Document ID
doc_5j0fyydy37t6fdg04vp9wqrd7v- Source document status
- Available
- File type
- application/pdf
- File size
- 19,472.571 KiB
- Location inside the source
- Page 380 Row 12 Line 1 Column level4
Source and reference
FY 2021 release No source record
- Fiscal year of record
- 2021
- Fetched from the source
- 2026-07-29 20:18
- Read and interpreted
- 2026-07-29 20:18
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_4ztr7hyy17es31qqqmz3j43vzb- Address of this item
- /en/BudgetDetail/Item/bi_4ztr7hyy17es31qqqmz3j43vzb
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “도시계획도로개설사업” · classification 401-01
- ○부림랜드~1100도로(중로1-1-47) 도시계획도로개설사업 2,095,000,000 KRW +40.1%
- ○부림랜드~1100도로(중로1-1-47) 도시계획도로개설사업 1,495,000,000 KRW
- ○부림랜드~1100도로(중로1-1-47) 도시계획도로개설사업 3,392,000,000 KRW −30.7%
- ○부림랜드~1100도로(중로1-1-47) 도시계획도로개설사업 497,000,000 KRW
- ○부림랜드~1100도로(중로1-1-47) 도시계획도로개설사업 1,497,000,000 KRW +201.2%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.