- Institution
- 경기도 연천군
- Department
- 맑은물관리사업소
○연천군 차집관로 개선사업(2단계)[전입금]
Programme 연천처리구역 차집관로 개선사업(2단계)(국비)
Amounts and period
- Budgeted amount
- 100,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 맑은물관리사업소 34,395,235,000 KRW0.3%
-
Policy 상하수도·식수 관리 32,907,700,000 KRW0.3%
-
Programme 하수관로 정비(하수도사업공기업특별회계) 11,529,000,000 KRW0.9%
-
Project 연천처리구역 차집관로 개선사업(2단계)(국비) 100,000,000 KRW100.0%
-
Budget category 시설비및부대비 100,000,000 KRW100.0%
-
Statistical item 시설비 100,000,000 KRW100.0%
-
Item ○연천군 차집관로 개선사업(2단계)[전입금] 100,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
100,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 연천군 · FY2024 본예산 · 통합회계 · 2024년도 일반 및 특별회계 세입세출 예산서
Opens in a new window
- Page
- 871 / 1,105
- Document ID
doc_12mbrp8ev577cqm8m0v1tbk66c- Source document status
- Available
- File type
- application/pdf
- File size
- 26,847.372 KiB
- Location inside the source
- Page 871 Row 18 Line 2 Column level4
Source and reference
FY 2024 release No source record
- Fiscal year of record
- 2024
- Fetched from the source
- 2026-07-29 20:28
- Read and interpreted
- 2026-07-29 20:28
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_513njwfpnw1d042y28636hfsjc- Address of this item
- /en/BudgetDetail/Item/bi_513njwfpnw1d042y28636hfsjc
Related records
Similar budgets
5 itemsKeyword “차집관로” · classification 401-01
- ○ 하수처리장(소규모) 차집관로 준설 100,000,000 KRW
- ○가남 차집관로 정비사업 시설비경정 40,000,000 KRW −71.4%
- ○가남 차집관로 정비사업 시설비경정 287,000,000 KRW −25.8%
- ○ 하수처리장(소규모) 차집관로 준설 100,000,000 KRW
- ○가남 차집관로 정비사업 시설비 387,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.