- Institution
- 서울특별시 동대문구
- Department
- 도로과
- 미끄럼방지포장 32,000원*1,000㎡
Programme 동부지하차도 도로정비 사업
Amounts and period
- Budgeted amount
- 32,000,000 KRW
- 기정액
- 0 KRW
- Change
- +32,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 25,255,468,000 KRW0.1%
-
Policy 편리하고 안전한 지역도로망 구축 25,196,115,000 KRW0.1%
-
Programme 도로 및 시설물 유지관리 17,574,921,000 KRW0.2%
-
Project 동부지하차도 도로정비 사업 230,000,000 KRW13.9%
-
Budget category 시설비및부대비 230,000,000 KRW13.9%
-
Statistical item 시설비 230,000,000 KRW13.9%
-
Item ○동부지하차도 정비 230,000,000 KRW13.9%
-
Calculation line - 미끄럼방지포장 32,000원*1,000㎡ 32,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
서울특별시 동대문구 · FY2021 2회 추경 · 통합회계 · 2021년 제2회 추가경정 사업예산서 PDF
Opens in a new window
- Page
- 161 / 180
- Document ID
doc_52frme5834earc3fmwebhqfyjt- Source document status
- Available
- File type
- application/pdf
- File size
- 1,937.033 KiB
- Location inside the source
- Page 161 Row 19 Line 3 Column level4
Source and reference
FY 2021 release No source record
- Fiscal year of record
- 2021
- Fetched from the source
- 2026-07-29 18:19
- Read and interpreted
- 2026-07-29 18:19
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_54wxkvm8e3msw19nx3f3czk3ce- Address of this item
- /en/BudgetDetail/Item/bi_54wxkvm8e3msw19nx3f3czk3ce
Related records
Similar budgets
5 itemsKeyword “미끄럼방지포장” · classification 401-01
- ○미끄럼방지포장 공사 47,000,000원 47,000,000 KRW
- ○미끄럼방지포장 40,000원*6,000㎡ 240,000,000 KRW +100.0%
- ○미끄럼방지포장 설치 91,000,000원 91,000,000 KRW
- ○급경사도로 미끄럼방지포장 20,000,000원 20,000,000 KRW
- ○미끄럼방지포장 공사 경정 47,300,000원 47,300,000 KRW +0.6%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.