- Institution
- 경기도 남양주시
- Department
- 산업환경과
○흄관(D=1000mm,L=80m) 및 집수정 설치 3개소
Programme 운수3리 농수로 정비공사
Amounts and period
- Budget amount
- 50,000,000 KRW
- 기정액
- 0 KRW
- Change
- +50,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Original and supplementary budgets by year
These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.
| Year | Original budget | Supplementary 4 | Year-on-year change |
|---|---|---|---|
| FY2017 | Amount unconfirmed | 50,000,000 KRW Selected | Not comparable |
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 산업환경과 1,490,732,000 KRW3.4%
-
Policy 쾌적한 도시조성 1,019,482,000 KRW4.9%
-
Programme 시가지 환경관리 193,240,000 KRW25.9%
-
Project 운수3리 농수로 정비공사 50,000,000 KRW100.0%
-
Budget category 시설비및부대비 50,000,000 KRW100.0%
-
Statistical item 시설비 50,000,000 KRW100.0%
-
Item ○흄관(D=1000mm,L=80m) 및 집수정 설치 3개소 50,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 남양주시 · FY2017 4회 추경 · 일반회계 · 2017년 세출예산사업명세서(일반회계)
Opens in a new window
- Page
- 102 / 125
- Document ID
doc_13v0ph7g8qkk1ybe9x44y4kbyv- Source document status
- Available
- File type
- application/pdf
- File size
- 1,469.031 KiB
- Location inside the source
- Page 102 Row 8 Line 1 Column level4
Source and reference
FY 2017 release No source record
- Fiscal year of record
- 2017
- Fetched from the source
- 2026-07-29 17:45
- Read and interpreted
- 2026-07-29 17:45
- Query snapshot refreshed
- 2026-11-16 11:44
- Item ID
bi_55zxbcd7q2zpc7m5r1cjac4xrp- Address of this item
- /en/BudgetDetail/Item/bi_55zxbcd7q2zpc7m5r1cjac4xrp
Related records
Similar budgets
5 itemsKeyword “1000mm” · classification 401-01
- ○ 천흥2리 농로포장 및 배수로 설치(L=100m,B=3.0m, D=1000mm) 20,000,000 KRW
- ○ 도원1리 배수로정비 공사 (벤치플륨관(1000C)L=80m,흄관(1000mm)L=10 m 19,630,000 KRW −10.8%
- ◎원와마을 경로당앞 수로관 설치 (L=150m, D=1000mm) 20,790,000 KRW
- ◎대교1리배수로정비(L=80m,D=1000mm) 34,650,000 KRW
- ○ 문덕1리 농로옆 배수로 설치(L=200m, D=1000mm) 30,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.