- Institution
- 경기도 여주시
- Department
- 건설과
○현황도로 정비공사(L=4.2km, B=3m) 경정
Programme 비법정도로포장 및 유지관리사업
Amounts and period
- Budget amount
- 1,030,000,000 KRW
- 기정액
- 730,000,000 KRW
- Change
- +300,000,000 KRW +41.1%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 65,360,219,000 KRW1.6%
-
Policy 풍요로운 지역 생활환경 개선 10,767,915,000 KRW9.6%
-
Programme 지역생활환경 정비 10,767,915,000 KRW9.6%
-
Project 비법정도로포장 및 유지관리사업 3,864,000,000 KRW26.7%
-
Budget category 시설비및부대비 3,855,000,000 KRW26.7%
-
Statistical item 시설비 3,850,000,000 KRW26.8%
-
Item ○현황도로 정비공사(L=4.2km, B=3m) 경정 1,030,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○현황도로 정비공사(L=4.2km, B=3m) 경정 1,030,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 여주시 · FY2025 4회 추경 · 통합회계 · 2025년 제4회 추가경정 예산서
Opens in a new window
- Page
- 309 / 572
View source document details
- Document ID
doc_52mc1dpe6qybfj03yyr55wa9gw- Source document status
- Available
- File type
- application/pdf
- File size
- 13,624.338 KiB
- Location inside the source
- Page 309 Row 7 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 20:31
- Read and interpreted
- 2026-07-29 20:31
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_5am172ezxehkd28776321fkr4k- Address of this item
- /en/BudgetDetail/Item/bi_5am172ezxehkd28776321fkr4k
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “현황도로” · classification 401-01
- ○현황도로 정비공사(L=4.2km, B=3m) 경정 730,000,000 KRW +121.2%
- ○현황도로 정비공사(L=4.2km, B=3m) 경정 730,000,000 KRW +121.2%
- ○현황도로 정비공사(L=4.2km, B=3m) 경정 1,030,000,000 KRW +41.1%
- ○현황도로 정비공사(L=2.2kn, B=3m) 330,000,000 KRW
- ○현황도로 정비공사(L=2.2kn, B=3m) 330,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.