- Institution
- 경기도 화성시
- Department
- 철도전략과
○사전타당성 재조사 용역
Programme 동탄인덕원선 인입선 역사 신설 사전타당성 조사
Amounts and period
- Budget amount
- 180,000,000 KRW
- 기정액
- 0 KRW
- Change
- +180,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 철도전략과 11,347,574,000 KRW1.6%
-
Policy 효율적인 철도수송 체계 구축 11,301,942,000 KRW1.6%
-
Programme 화성시철도망 구축 467,992,000 KRW38.5%
-
Project 동탄인덕원선 인입선 역사 신설 사전타당성 조사 180,000,000 KRW100.0%
-
Budget category 시설비및부대비 180,000,000 KRW100.0%
-
Statistical item 시설비 180,000,000 KRW100.0%
-
Item ○사전타당성 재조사 용역 180,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
180,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 화성시 · FY2023 본예산 · 일반회계 · W_IL231005225616021
Opens in a new window
- Page
- 386 / 540
- Document ID
doc_6vfmb77b1vn9w189jzpzgmyrjn- Source document status
- Available
- File type
- application/pdf
- File size
- 2,895.803 KiB
- Location inside the source
- Page 386 Row 10 Line 2 Column level4
Source and reference
FY 2023 release No source record
- Fiscal year of record
- 2023
- Fetched from the source
- 2026-07-29 20:24
- Read and interpreted
- 2026-07-29 20:24
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_5arx5g8an7z347yxfssh93kwht- Address of this item
- /en/BudgetDetail/Item/bi_5arx5g8an7z347yxfssh93kwht
Related records
Similar budgets
5 itemsKeyword “사전타당성” · classification 401-01
- □재개발정비사업 사전타당성 조사 용역 60,000,000 KRW
- ○ 관광지구 지정 사전타당성 용역 180,000,000 KRW
- ○전농도시환경 재정비촉진계획 변경 사전타당성 용역 33,000,000 KRW
- ○새솔동~안산 연결도로 사전타당성조사 용역 22,000,000 KRW
- ○제2차 구국도 건설사업 사전타당성 조사용역 200,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.