- Institution
- 충청북도 청주시
- Department
- 도로사업본부지역개발과
◎산성도로 교통개선사업 미지급 용지 보상금
Programme 산성도로 교통개선
Amounts and period
- Budgeted amount
- 9,500,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로사업본부지역개발과 17,635,375,000 KRW0.1%
-
Policy 시민친화형도로교통기반조성 17,268,520,000 KRW0.1%
-
Programme 시민친화형 도로환경정비 10,564,440,000 KRW0.1%
-
Project 산성도로 교통개선 9,500,000 KRW100.0%
-
Budget category 시설비및부대비 9,500,000 KRW100.0%
-
Statistical item 시설비 9,500,000 KRW100.0%
-
Item ◎산성도로 교통개선사업 미지급 용지 보상금 9,500,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
9,500,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
View source document details
- Document ID
doc_79phkk0wtb690tk9edpwvpkggy- Source document status
- Available
- File type
- application/pdf
- File size
- 364.152 KiB
- Location inside the source
- Page 1 Row 8 Line 1 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 18:33
- Read and interpreted
- 2026-07-29 18:33
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_5bfcf5v32b1rm2xmjjk6k687qh- Address of this item
- /en/BudgetDetail/Item/bi_5bfcf5v32b1rm2xmjjk6k687qh
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “교통개선사업” · classification 401-01
- ◎산성도로 교통개선사업 미지급 용지 보상금 15,000,000 KRW
- ◎산성도로 교통개선사업(L=473m) 612,000,000 KRW
- ○캠프마켓 주변 교통개선사업 실시설계 용역 20,000,000 KRW
- ○캠프마켓 주변 교통개선사업 실시설계 용역 20,000,000 KRW
- ○옥길지구 교통개선사업 실시설계용역 120,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.