- Institution
- 경기도 가평군
- Department
- 건설과
○군도10호선(상판리) 배수로 정비공사
Programme 도로정비(보조)
Amounts and period
- Budgeted amount
- 50,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 20,935,005,000 KRW0.2%
-
Policy 도로망구축및관리(교통및물류/도로) 6,609,472,000 KRW0.8%
-
Programme 도로관리 2,672,472,000 KRW1.9%
-
Project 도로정비(보조) 1,795,332,000 KRW2.8%
-
Budget category 시설비및부대비 1,326,000,000 KRW3.8%
-
Statistical item 시설비 1,321,000,000 KRW3.8%
-
Item ○군도10호선(상판리) 배수로 정비공사 50,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
50,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
20 items- ○군도10호선(상판리) 배수로 정비공사 50,000,000 KRW Opens in a new window
- ○마을제설반(트랙터) 인부임 75,332,000 KRW Opens in a new window
- ○포대아스콘 20,000원*1,500포 30,000,000 KRW Opens in a new window
- ○시선유도봉 20,000원*500개 10,000,000 KRW Opens in a new window
- ○도로보수자재 25,000,000원 25,000,000 KRW Opens in a new window
- ○도로반사경 300,000원*50개 15,000,000 KRW Opens in a new window
- ○군도1호선(상색리, 하색2리) 배수시설 정비 공사 130,000,000 KRW Opens in a new window
- ○농어촌도로 207호선(행현리) 배수시설 정비 공사 10,000,000 KRW Opens in a new window
- ○농어촌도로 105호선(가일리) 도로재포장공사 189,000,000 KRW Opens in a new window
- ○도시계획도로(청평) 재포장공사 120,000,000 KRW Opens in a new window
- ○도시계획도로(현리 265-13일원) 도로재포장 공사 50,000,000 KRW Opens in a new window
- ○도시계획도로(대곡리 406-4) 도로 재포장공사 140,000,000 KRW Opens in a new window
- ○도시계획도로(대곡리 195-7) 도로 재포장공사 30,000,000 KRW Opens in a new window
- ○도시계획도로(대곡리) 배수로 정비공사 50,000,000 KRW Opens in a new window
- ○도로 및 부속시설물 유지관리비 70,000,000 KRW Opens in a new window
- ○유지관리 연간단가 250,000,000원 250,000,000 KRW Opens in a new window
- ○도로변 위험수목 제거 80,000,000원 80,000,000 KRW Opens in a new window
- ○[주민참여]승안리 자전거도로(제방도로) 재포장공사 77,000,000 KRW Opens in a new window
- ○[주민참여]군도7호선 배수로 정비사업 75,000,000 KRW Opens in a new window
- ○시설부대비 5,000,000원 5,000,000 KRW Opens in a new window
Data source
View source document details
- Document ID
doc_6vfwtjvk3zrtycby8hxev38svz- Source document status
- Available
- File type
- application/pdf
- File size
- 5,464.428 KiB
- Location inside the source
- Page 331 Row 6 Line 16 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 19:06
- Read and interpreted
- 2026-07-29 19:06
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_5dnda0eh5cc266mpkyvvbqgxqc- Address of this item
- /en/BudgetDetail/Item/bi_5dnda0eh5cc266mpkyvvbqgxqc
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “군도10호선” · classification 401-01
- ○동산1리 군도10호선 배수로 정비공사(L=130m) 40,000,000 KRW
- ○동산1리 군도10호선 배수로 정비공사(L=130m) 40,000,000 KRW
- ○남산2리 군도10호선 배수로 정비공사(L=50m) 100,000,000 KRW
- ○대율2리 군도10호선 배수로 설치공사(L=150m) 60,000,000 KRW
- ○[주민참여]군도10호선(운악리)배수시설 정비공사 50,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.