- Institution
- 경기도 하남시
- Department
- 공원녹지과
○미사지구 2단계 수목울타리다듬기 공사(단가계약) 경정
Programme 가로수 관리
Amounts and period
- Budgeted amount
- 0 KRW
- 기정액
- 11,200,000 KRW
- Change
- −11,200,000 KRW −100.0%
A zero here is what the source recorded. Missing values are never folded into zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 공원녹지과 11,277,522,000 KRW0.0%
-
Policy 쾌적한 도시숲 조성 및 관리 8,073,585,000 KRW0.0%
-
Programme 도시숲 관리 7,457,156,000 KRW0.0%
-
Project 가로수 관리 557,319,000 KRW0.0%
-
Budget category 시설비및부대비 557,319,000 KRW0.0%
-
Statistical item 시설비 557,319,000 KRW0.0%
-
Item ○미사지구 2단계 수목울타리다듬기 공사(단가계약) 경정 0 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○미사지구 2단계 수목울타리다듬기 공사(단가 계약) 경정 0원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
8 items- ○미사지구 2단계 수목울타리다듬기 공사(단가계약) 경정 0 KRW Opens in a new window
- ○현안1·2지구·기타지역 수목울타리다듬기 공사(단가계약) 경정 30,638,000 KRW Opens in a new window
- ○위례지구 수목울타리다듬기 공사(단가계약) 경정 16,165,000 KRW Opens in a new window
- ○미사지구 1단계 수목울타리다듬기 공사(단가계약) 경정 44,404,000 KRW Opens in a new window
- ○미사대로·하남대로·서하남로 풀베기 공사(단가계약) 경정 76,490,000 KRW Opens in a new window
- ○풍산지구·신장지구·원도심·기타지역 풀뽑기 공사(단가계약) 경정 50,500,000 KRW Opens in a new window
- ○미사지구 2단계 풀뽑기 공사(단가계약) 경정 0 KRW Opens in a new window
- ○위례지구 풀뽑기 공사(단가계약) 경정 7,362,000 KRW Opens in a new window
Data source
-
Open source PDF
경기도 하남시 · FY2020 5회 추경 · 수질개선특별회계 · ★2020년 제5회 일반 및 기타특별회계 추가경정 예산서(게시용)
Opens in a new window
- Page
- 265 / 419
View source document details
- Document ID
doc_4g12r1yd7zj31pj7svkrgskaba- Source document status
- Available
- File type
- application/pdf
- File size
- 8,256.615 KiB
- Location inside the source
- Page 265 Row 4 Line 7 Column level4
Source and reference
FY 2020 release No source record
- Fiscal year of record
- 2020
- Fetched from the source
- 2026-07-29 20:13
- Read and interpreted
- 2026-07-29 20:13
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_5ey34t0tzdgjr24ec4yamsw92t- Address of this item
- /en/BudgetDetail/Item/bi_5ey34t0tzdgjr24ec4yamsw92t
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “수목울타리다듬기” · classification 401-01
- ○미사지구 2단계 수목울타리다듬기 공사(단가계약) 경정 0 KRW −100.0%
- ○미사지구 1단계 수목울타리다듬기 공사(단가계약) 경정 78,400,000 KRW −33.3%
- ○미사지구 2단계 수목울타리다듬기 공사(단가계약) 11,200,000 KRW
- ○미사지구 1단계 수목울타리다듬기 공사(단가계약) 경정 44,404,000 KRW −43.4%
- ○미사지구 2단계 수목울타리다듬기 공사(단가계약) 11,200,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.