- Institution
- 충청북도 청주시
- Department
- 환경관리본부 자원정책과
◎휴암7통 아스콘덧씌우기공사(L=320m)
Programme 광역매립장 간접영향권 마을 주민숙원사업
Amounts and period
- Budgeted amount
- 20,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 환경관리본부 자원정책과 23,314,001,000 KRW0.1%
-
Policy 맑고 깨끗한 청결도시 청주 조성 23,249,059,000 KRW0.1%
-
Programme 폐기물 처리시설 확충 965,114,000 KRW2.1%
-
Project 광역매립장 간접영향권 마을 주민숙원사업 965,114,000 KRW2.1%
-
Budget category 시설비및부대비 965,114,000 KRW2.1%
-
Statistical item 시설비 959,286,000 KRW2.1%
-
Item ◎휴암7통 아스콘덧씌우기공사(L=320m) 20,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
20,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
19 items- ◎휴암7통 아스콘덧씌우기공사(L=320m) 20,000,000 KRW Opens in a new window
- ◎비하25통 주봉저수지 조경공사(L=10m) 40,000,000 KRW Opens in a new window
- ◎서촌18통 아스콘덧씌우기공사(L=400m) 40,000,000 KRW Opens in a new window
- ◎석소26통 마을안길정비공사(L=600m) 60,000,000 KRW Opens in a new window
- ◎지동15통 수로관 복개공사(L=300m) 85,000,000 KRW Opens in a new window
- ◎지동16통 농로포장공사(L=140m) 20,000,000 KRW Opens in a new window
- ◎정봉28통 마을회관 지붕공사 40,000,000 KRW Opens in a new window
- ◎수의13통 마을안길정비공사(L=100m) 50,000,000 KRW Opens in a new window
- ◎수의14통 도로포장공사(L=220m) 80,000,000 KRW Opens in a new window
- ◎사인1리 인도설치공사(L=120m) 120,000,000 KRW Opens in a new window
- ◎사인2리 용배수로정비공사(L=595m) 70,000,000 KRW Opens in a new window
- ◎월곡1리 관로정비공사(L=160m) 50,000,000원 50,000,000 KRW Opens in a new window
- ◎월곡3리 아스콘덧씌우기공사(A=4,500㎡) 60,000,000 KRW Opens in a new window
- ◎학천리 BOX설치공사(2개소) 50,000,000원 50,000,000 KRW Opens in a new window
- ◎신전8통 마을안길정비공사(L=720m) 60,000,000 KRW Opens in a new window
- ◎비하21통 관로정비 및 도로포장공사(L=610m) 80,000,000 KRW Opens in a new window
- ◎휴암7통외 14개소 주민숙원사업 실시설계용역 31,418,000 KRW Opens in a new window
- ◎정봉28통 마을회관 지붕공사 실시설계용역 2,868,000 KRW Opens in a new window
- ◎휴암7통외 15개소 주민숙원사업 추진 시설부대비 5,828,000 KRW Opens in a new window
Data source
- Document ID
doc_1yy98m4jgeafjqtqm3r2nzngyt- Source document status
- Available
- File type
- application/pdf
- File size
- 550.672 KiB
- Location inside the source
- Page 24 Row 2 Line 1 Column level4
Source and reference
FY 2018 release No source record
- Fiscal year of record
- 2018
- Fetched from the source
- 2026-07-29 17:56
- Read and interpreted
- 2026-07-29 17:56
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_5hb726dk4zhn98n21jg0krga7v- Address of this item
- /en/BudgetDetail/Item/bi_5hb726dk4zhn98n21jg0krga7v
Related records
Similar budgets
5 itemsKeyword “아스콘덧씌우기공사” · classification 401-01
- ○용신3리(오릿골)아스콘덧씌우기공사(L=100m) 19,306,000 KRW −3.5%
- ○운정1리(우복실)아스콘덧씌우기공사(L=300m) 0 KRW −100.0%
- ○도성리(마안골)아스콘덧씌우기공사(L=100m) 25,000,000 KRW
- ○안포3리(상포)아스콘덧씌우기공사(L=100m) 20,000,000 KRW
- ○안포1리(백인)아스콘덧씌우기공사(L=250m) 0 KRW −100.0%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.