- Institution
- 강원특별자치도 원주시
- Department
- 건설방재과
○단계동 종합청사사거리 지하차도 설치
Programme 지방채상환
Amounts and period
- Budgeted amount
- 64,800,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설방재과 38,684,725,000 KRW0.2%
-
Policy 재무활동(건설방재과) 4,867,050,000 KRW1.3%
-
Programme 보전지출(건설방재과) 4,867,050,000 KRW1.3%
-
Project 지방채상환 4,867,050,000 KRW1.3%
-
Budget category 차입금이자상환 217,050,000 KRW29.9%
-
Statistical item 통화금융기관차입금이자상환 67,050,000 KRW96.6%
-
Item ○단계동 종합청사사거리 지하차도 설치 64,800,000 KRW
- Category–statistical code
- 311-02
- Group
- Not provided in source
Original description
64,800,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
12 items- ○단계동 종합청사사거리 지하차도 설치 64,800,000 KRW Opens in a new window
- ○봉산화실~태장국도42호선간 도로개설 15,000,000 KRW Opens in a new window
- ○서부순환도로(무실~만종간) 개설 45,000,000 KRW Opens in a new window
- ○단계동 종합청사사거리 지하차도 설치 18,000,000 KRW Opens in a new window
- ○도시계획도로 1-13호(태장~행구간) 도로개설 72,000,000 KRW Opens in a new window
- ○봉산화실~태장 국도42호선간 도로개설 2,250,000 KRW Opens in a new window
- ○봉산화실~태장국도42호선간 도로개설 1,000,000,000 KRW Opens in a new window
- ○서부순환도로(무실~만종간) 개설 1,000,000,000 KRW Opens in a new window
- ○단계동 종합청사사거리 지하차도 설치 300,000,000 KRW Opens in a new window
- ○도시계획도로 1-13호(태장~행구간) 도로개설 1,100,000,000 KRW Opens in a new window
- ○봉산화실~태장 국도42호선간 도로개설 250,000,000 KRW Opens in a new window
- ○단계동 종합청사사거리 지하차도 설치 1,000,000,000 KRW Opens in a new window
Data source
-
Open source PDF
강원특별자치도 원주시 · FY2022 본예산 · 일반회계 · 2022 본예산 회계별 세입, 세출예산 사업명세서 건설교통국
Opens in a new window
- Page
- 10 / 11
View source document details
- Document ID
doc_5mmhe86mhsx6c79d7zz0mhytnz- Source document status
- Available
- File type
- application/pdf
- File size
- 223.741 KiB
- Location inside the source
- Page 10 Row 15 Line 3 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 18:24
- Read and interpreted
- 2026-07-29 18:24
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_5k4et5c0vm00cwga5m5ypg8wy0- Address of this item
- /en/BudgetDetail/Item/bi_5k4et5c0vm00cwga5m5ypg8wy0
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “종합청사사거리” · classification 311-02
- ○단계동 종합청사사거리 지하차도 설치 33,000,000 KRW
- ○단계동 종합청사사거리 지하차도 설치 38,000,000 KRW
- ○단계동 종합청사사거리 지하차도 설치 86,400,000 KRW
- ○단계동 종합청사사거리 지하차도 설치 107,500,000 KRW
- ○단계동 종합청사사거리 지하차도 설치 124,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.