- Institution
- 인천광역시 강화군
- Department
- 길상면
○온수3리 공장말 배수로 정비공사(수로관800C, L=240m)
Programme 소규모지역개발(길상면 소하천(세천) 및 배수로정비 공사)
Amounts and period
- Budgeted amount
- 30,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 길상면 1,435,713,000 KRW2.1%
-
Policy 길상면 사업경비 1,240,735,000 KRW2.4%
-
Programme 지역사회개발 782,560,000 KRW3.8%
-
Project 소규모지역개발(길상면 소하천(세천) 및 배수로정비 공사) 175,000,000 KRW17.1%
-
Budget category 시설비및부대비 175,000,000 KRW17.1%
-
Statistical item 시설비 175,000,000 KRW17.1%
-
Item ○온수3리 공장말 배수로 정비공사(수로관800C, L=240m) 30,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○온수3리 공장말 배수로 정비공사(수로관800C, L=240m) 30,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
7 items- ○온수3리 공장말 배수로 정비공사(수로관800C, L=240m) 30,000,000 KRW Opens in a new window
- ○단자천 간이제수문 설치공사(제수문 1식) 20,000,000 KRW Opens in a new window
- ○장안천 하천 정비공사(석축H=2.5m, L=95m) 35,000,000 KRW Opens in a new window
- ○선두1리 배수로 정비공사(수로관600C,L=70m) 20,000,000 KRW Opens in a new window
- ○선두5리 도로변 배수로 정비공사(수로관800C, L=140m) 20,000,000 KRW Opens in a new window
- ○초지2리 수로관 정비공사(수로관800C,L=150m) 20,000,000 KRW Opens in a new window
- ○장흥1리 마을안길 정비 및 배수로 정비공사(도로보수,배수로정비 B=3.0, L=340m) 30,000,000 KRW Opens in a new window
Data source
-
Open source PDF
인천광역시 강화군 · FY2018 본예산 · 일반회계 · 2018년_본예산_세출예산사업명세서(일반회계)
Opens in a new window
- Page
- 458 / 524
View source document details
- Document ID
doc_32kkhktczmdh1g4m5eqwnkthx2- Source document status
- Available
- File type
- application/pdf
- File size
- 2,241.581 KiB
- Location inside the source
- Page 458 Row 10 Line 5 Column level4
Source and reference
FY 2018 release No source record
- Fiscal year of record
- 2018
- Fetched from the source
- 2026-07-29 17:54
- Read and interpreted
- 2026-07-29 17:54
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_5m5d8nnd4yhks01b226479p6ja- Address of this item
- /en/BudgetDetail/Item/bi_5m5d8nnd4yhks01b226479p6ja
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “수로관800C” · classification 401-01
AI analysis report
AI analysis reports are not yet available.