- Institution
- 서울특별시
- Department
- 재난안전실 도로계획과
ㅇ 공사비
Programme 신당역~신당지하상가 연결통로 설치
Amounts and period
- Budget amount
- 570,000,000 KRW
- 기정액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 재난안전실 도로계획과 287,749,142,000 KRW0.2%
-
Policy 도로 건설 284,416,233,000 KRW0.2%
-
Programme 간선도로망 확충 161,230,157,000 KRW0.4%
-
Project 신당역~신당지하상가 연결통로 설치 600,000,000 KRW95.0%
-
Budget category 시설비및부대비 Present in the source but not extracted
-
Statistical item 시설비 570,000,000 KRW100.0%
-
Item ㅇ 공사비 570,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
570,000,000원 = 570,000
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
-
Open source PDF
서울특별시 · FY2025 1회 추경 · 통합회계 · 68679b254772f5.93414953
Opens in a new window
- Page
- 324 / 435
- Document ID
doc_17syn4xqnx5v13rs4at3wyvzax- Source document status
- Available
- File type
- application/pdf
- File size
- 10,047.756 KiB
- Location inside the source
- Page 324 Row 21 Line 54 Column page_text
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 20:33
- Read and interpreted
- 2026-07-29 20:33
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_5pp8989easjyh8zhcbghbwq22e- Address of this item
- /en/BudgetDetail/Item/bi_5pp8989easjyh8zhcbghbwq22e
Related records
Similar budgets
5 itemsKeyword “공사비” · classification 401-01
- ○공사비 경정 4,500,000,000원 4,500,000,000 KRW 0.0%
- ○공사비 경정 1,762,000,000원 1,762,000,000 KRW 0.0%
- ◎공사비 499,000,000원 499,000,000 KRW −5.3%
- ○공사비(자체) 6,100,000,000원 6,100,000,000 KRW
- ○공사비 1,800,000,000원 1,800,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.