- Institution
- 경기도 연천군
- Department
- 전곡읍
○콘크리트포장공사(B=3.0m) L=120.0m
Programme 양원리 931번지 일원 농로포장공사
Amounts and period
- Budgeted amount
- 21,600,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 전곡읍 1,617,123,000 KRW1.3%
-
Policy 전곡읍 사업경비 653,950,000 KRW3.3%
-
Programme 소규모 지역개발 653,950,000 KRW3.3%
-
Project 양원리 931번지 일원 농로포장공사 21,600,000 KRW100.0%
-
Budget category 시설비및부대비 21,600,000 KRW100.0%
-
Statistical item 시설비 21,600,000 KRW100.0%
-
Item ○콘크리트포장공사(B=3.0m) L=120.0m 21,600,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
360㎡*60,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 연천군 · FY2025 본예산 · 통합회계 · FY2025 예산서(경기 연천군)
Opens in a new window
- Page
- 1,062 / 1,135
- Document ID
doc_4n1pk1q8e4nnf8p2gjezmww1ce- Source document status
- Available
- File type
- application/pdf
- File size
- 21,342.818 KiB
- Location inside the source
- Page 1,062 Row 4 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 20:33
- Read and interpreted
- 2026-07-29 20:33
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_5sz7tky0sbjpdhymd1mdtp6va6- Address of this item
- /en/BudgetDetail/Item/bi_5sz7tky0sbjpdhymd1mdtp6va6
Related records
Similar budgets
5 itemsKeyword “콘크리트포장공사” · classification 401-01
- ○콘크리트포장공사(B=3.0m)L=120.0m 21,600,000 KRW
- ○철거후 콘크리트포장공사(B=3.0m)L=200.0m 70,000,000 KRW
- ○콘크리트포장공사(B=3.0m) L=70.0m 16,800,000 KRW
- ○콘크리트포장공사(B=3.0m) L=110.0m 19,800,000 KRW
- ○콘크리트포장공사(B=3.0m) L=200.0m) 36,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.