- Institution
- 대구광역시 군위군
- Department
- 안전관리과
○(소)하천시설 유지보수사업경정
Programme 소하천정비
Amounts and period
- Budgeted amount
- 1,500,000,000 KRW
- 기정액
- 1,000,000,000 KRW
- Change
- +500,000,000 KRW +50.0%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 안전관리과 32,195,805,000 KRW4.7%
-
Policy 재해 및 재난 안전관리 28,442,327,000 KRW5.3%
-
Programme 재난복구 27,747,800,000 KRW5.4%
-
Project 소하천정비 12,135,500,000 KRW12.4%
-
Budget category 시설비및부대비 12,117,500,000 KRW12.4%
-
Statistical item 시설비 12,092,500,000 KRW12.4%
-
Item ○(소)하천시설 유지보수사업경정 1,500,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○(소)하천시설 유지보수사업 경정 1,500,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
23 items- ○(소)하천시설 유지보수사업경정 1,500,000,000 KRW Opens in a new window
- ○무성3리 상무천 정비공사(L=50m) 100,000,000 KRW Opens in a new window
- ○수서2리 장수천 제방 정비공사(L=70m) 150,000,000 KRW Opens in a new window
- ○내량2리 개봉천 정비공사(L=70m) 300,000,000 KRW Opens in a new window
- ○대흥2리 농암천 정비공사(L=80m) 30,000,000 KRW Opens in a new window
- ○용대리 물위천 제방 정비공사(L=100m)(특교세재투자 100,000,000 KRW Opens in a new window
- ○위성1리 백골천 제방 정비공사(L=100m) 100,000,000 KRW Opens in a new window
- ○매곡2리 고매지앞 독골천 정비공사(L=100m) 80,000,000 KRW Opens in a new window
- ○거매리 거매제 보강공사(L=50m) 50,000,000 KRW Opens in a new window
- ○금매2리 마을앞 삽실천 정비공사(L=120m) 100,000,000 KRW Opens in a new window
- ○마시2리 명마천 보수공사(L=70m) 80,000,000 KRW Opens in a new window
- ○창평1리 신원천 정비공사(L=80m) 100,000,000 KRW Opens in a new window
- ○이화2리 선이천 정비공사(L=90m) 100,000,000 KRW Opens in a new window
- ○두북리 두실 두북천 정비공사(L=330m) 300,000,000 KRW Opens in a new window
- ○두북리 원골 두북천 정비공사(L=300m) 300,000,000 KRW Opens in a new window
- ○달산1리 달산천 준설공사(L=350m) 30,000,000 KRW Opens in a new window
- ○달산2리 달산천 준설공사(L=300m) 30,000,000 KRW Opens in a new window
- ○파전리 신덕천 정비공사(L=110m) 120,000,000 KRW Opens in a new window
- ○봉림2리 범박천 소교량 설치공사(1식) 경정 300,000,000 KRW Opens in a new window
- ○화전2리 가곡천 가곡2무명교 개체공사(1식) 200,000,000 KRW Opens in a new window
- ○가암1리 가암천 정비공사(L=250m) 300,000,000 KRW Opens in a new window
- ○가암2리 가암천 정비공사(L=250m) 300,000,000 KRW Opens in a new window
- ○삼국유사 가암2리 무명4교 개체공사(특별조 250,000,000 KRW Opens in a new window
Data source
View source document details
- Document ID
doc_6hhtre8bs5tgdanenqmtny1jm1- Source document status
- Available
- File type
- application/pdf
- File size
- 73.808 KiB
- Location inside the source
- Page 2 Row 2 Line 16 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 19:09
- Read and interpreted
- 2026-07-29 19:09
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_5yj70tgavs6badfqzk0wxqn33j- Address of this item
- /en/BudgetDetail/Item/bi_5yj70tgavs6badfqzk0wxqn33j
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “유지보수사업경정” · classification 401-01
- ○(소)하천시설 유지보수사업경정 1,300,000,000 KRW +30.0%
- ○임도 유지보수사업경정 83,500,000 KRW −18.1%
- ○마을회관(경로당) 유지보수사업경정 1,497,000,000 KRW +15.4%
- ○마을회관(경로당) 유지보수사업경정 1,714,000,000 KRW +14.5%
- ○국가하천 유지보수사업경정 1,509,224,000 KRW +13.7%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.