- Institution
- 서울특별시
- Department
- 물순환안전국 수변감성도시과
ㅇ 기본조사설계비
Programme 응봉유수지 CSOs 저류조 설치
Amounts and period
- Budgeted amount
- 487,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 물순환안전국 수변감성도시과 13,651,435,000 KRW3.6%
-
Policy 물환경 관리 13,440,812,000 KRW3.6%
-
Programme 물환경개선 및 관리 2,591,693,000 KRW18.8%
-
Project 응봉유수지 CSOs 저류조 설치 487,000,000 KRW100.0%
-
Budget category 시설비및부대비 Present in the source but not extracted
-
Statistical item 시설비 487,000,000 KRW100.0%
-
Item ㅇ 기본조사설계비 487,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
487,000,000원 = 487,000
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
서울특별시 · FY2025 본예산 · 통합회계 · 6784696c0cdae9.24315721
Opens in a new window
- Page
- 9 / 42
- Document ID
doc_5bknzpj0q0r7skf7c3amdfgxbj- Source document status
- Available
- File type
- application/pdf
- File size
- 564.206 KiB
- Location inside the source
- Page 9 Row 7 Line 18 Column page_text
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 19:00
- Read and interpreted
- 2026-07-29 19:00
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_5zh4vthswva4agrd9rzbe7nq6d- Address of this item
- /en/BudgetDetail/Item/bi_5zh4vthswva4agrd9rzbe7nq6d
Related records
Similar budgets
5 itemsKeyword “기본조사설계비” · classification 401-01
- ㅇ 기본조사설계비(중앙부처 타당성 조사 수행 수수료) 200,000,000 KRW
- ㅇ 기본조사설계비(기본설계, 도시계획변경용역) 671,875,000 KRW
- ◎기본조사설계비(신규) 1,000,000,000 KRW
- ○기성면청사 신축공사 기본조사설계비 60,000,000 KRW
- ○기본조사설계비 22,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.