- Institution
- 전라남도 강진군
- Department
- 건설과
○구국도18호선(도원~팔영)재포장공사
Programme 군도사업
Amounts and period
- Budgeted amount
- 397,120,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 7,081,202,000 KRW5.6%
-
Policy 도로시설관리 4,628,320,000 KRW8.6%
-
Programme 군도,농어촌 도로사업 2,478,120,000 KRW16.0%
-
Project 군도사업 800,000,000 KRW49.6%
-
Budget category 시설비및부대비 800,000,000 KRW49.6%
-
Statistical item 시설비 794,240,000 KRW50.0%
-
Item ○구국도18호선(도원~팔영)재포장공사 397,120,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
400,000,000원*99.28%
Institution and programme names are shown as the original Korean source text.
Detailed budget items
4 itemsData source
- Document ID
doc_5fv9rm7e60y0m2wbf1g77a5cdt- Source document status
- Available
- File type
- application/pdf
- File size
- 167.197 KiB
- Location inside the source
- Page 1 Row 7 Line 4 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-28 22:08
- Read and interpreted
- 2026-07-28 22:08
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_60tm7whs0m1jhr3h4e331edyts- Address of this item
- /en/BudgetDetail/Item/bi_60tm7whs0m1jhr3h4e331edyts
Related records
Similar budgets
Keyword “구국도18호선” · classification 401-01
No items with the same classification were found among the candidates checked.
AI analysis report
AI analysis reports are not yet available.