- Institution
- 경기도 화성시
- Department
- 도로과
○시도31호선 도로확포장공사경정
Programme 시도31호선 도로확포장공사
Amounts and period
- Budget amount
- 5,000,000,000 KRW
- 기정액
- 10,000,000,000 KRW
- Change
- −5,000,000,000 KRW −50.0%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 67,326,596,000 KRW7.4%
-
Policy 도로망확충을 통한 교통체증 해소 29,793,950,000 KRW16.8%
-
Programme 시도 확ㆍ포장 12,121,950,000 KRW41.2%
-
Project 시도31호선 도로확포장공사 5,000,000,000 KRW100.0%
-
Budget category 시설비및부대비 5,000,000,000 KRW100.0%
-
Statistical item 시설비 5,000,000,000 KRW100.0%
-
Item ○시도31호선 도로확포장공사경정 5,000,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○시도31호선 도로확포장공사 경정 5,000,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 화성시 · FY2023 본예산 · 일반회계 · W_IL230508074814021
Opens in a new window
- Page
- 191 / 324
View source document details
- Document ID
doc_0mhshqcdj2wjzs90se6gny0c4k- Source document status
- Available
- File type
- application/pdf
- File size
- 1,862.763 KiB
- Location inside the source
- Page 191 Row 2 Line 2 Column level4
Source and reference
FY 2023 release No source record
- Fiscal year of record
- 2023
- Fetched from the source
- 2026-07-29 20:24
- Read and interpreted
- 2026-07-29 20:24
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_68dc3nxspvd6y419yyv97s0x96- Address of this item
- /en/BudgetDetail/Item/bi_68dc3nxspvd6y419yyv97s0x96
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “도로확포장공사경정” · classification 401-01
- ◎작촌~해월간 도로확포장공사경정 5,500,000,000 KRW +22.2%
- ○상기~내리간 도로확포장공사경정 3,500,000,000 KRW −50.0%
- ○와우-배양간 도로확포장공사경정 3,000,000,000 KRW +200.0%
- ○보통~수기간 도로확포장공사경정 3,800,000,000 KRW +153.3%
- ◎모전-도지간 도로확포장공사경정 11,600,000,000 KRW +13.7%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.