- Institution
- 경기도 이천시
- Department
- 기업지원과
◎사동리 (주)풍진티에프씨 주변 노상 주차장및 미끄럼방지시설 설치 사 업
Programme 소규모 기업환경 개선사업(보조)
Amounts and period
- Budgeted amount
- 80,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 기업지원과 3,562,375,000 KRW2.2%
-
Policy 기업하기 좋은 환경조성 1,218,027,000 KRW6.6%
-
Programme 차별화된 기업환경 조성 1,218,027,000 KRW6.6%
-
Project 소규모 기업환경 개선사업(보조) 301,000,000 KRW26.6%
-
Budget category 시설비및부대비 301,000,000 KRW26.6%
-
Statistical item 시설비 301,000,000 KRW26.6%
-
Item ◎사동리 (주)풍진티에프씨 주변 노상 주차장및 미끄럼방지시설 설치 사 업 80,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
◎사동리 (주)풍진티에프씨 주변 노상 주차장 및 미끄럼방지시설 설치 사 업 80,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
5 items- ◎사동리 (주)풍진티에프씨 주변 노상 주차장및 미끄럼방지시설 설치 사 업 80,000,000 KRW Opens in a new window
- ◎부발읍 아미리 3번국도 인도개선공사 100,000,000 KRW Opens in a new window
- ◎장암리 (주)HCT앞 아스콘 재포장 및 교량연장설치사업 50,000,000 KRW Opens in a new window
- ◎사동리 (주)삼환까뮤 진입도로 아스콘 재포장 공사 50,000,000 KRW Opens in a new window
- ◎(주)복천식품 화장실 개보수공사 21,000,000 KRW Opens in a new window
Data source
-
Open source PDF
경기도 이천시 · FY2012 본예산 · 통합회계 · 2012년_일반_및_특별회계_세입세출_예산서
Opens in a new window
- Page
- 305 / 732
- Document ID
doc_7zzp65sy7eww53x0zg6qtsn82t- Source document status
- Available
- File type
- application/pdf
- File size
- 4,449.971 KiB
- Location inside the source
- Page 305 Row 9 Line 3 Column level4
Source and reference
FY 2012 release No source record
- Fiscal year of record
- 2012
- Fetched from the source
- 2026-07-29 19:57
- Read and interpreted
- 2026-07-29 19:57
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_69pk7w00eqgbv7cxb5h013cfst- Address of this item
- /en/BudgetDetail/Item/bi_69pk7w00eqgbv7cxb5h013cfst
Related records
Similar budgets
5 itemsKeyword “미끄럼방지시설” · classification 401-01
- ○미끄럼방지시설 설치 20,000,000 KRW
- ○미끄럼방지시설 설치 20,000,000 KRW
- □ 학사대2길 미끄럼방지시설 정비 및 핸드레일 설치 50,000,000 KRW
- ○버스정류장 미끄럼방지시설 설치(특조) 96,000,000 KRW
- ○미끄럼방지시설 설치 및 보수 100,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.