- Institution
- 충청남도 예산군
- Department
- 산림녹지과
○작업임도 경정 155,000,000원
Programme 임도시설(전환사업)
Amounts and period
- Budgeted amount
- 155,000,000 KRW
- 기정액
- 69,750,000 KRW
- Change
- +85,250,000 KRW +122.2%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 산림녹지과 30,032,165,000 KRW0.5%
-
Policy 임업 경쟁력 강화 27,487,858,000 KRW0.6%
-
Programme 산림보호 6,378,079,000 KRW2.4%
-
Project 임도시설(전환사업) 450,513,000 KRW34.4%
-
Budget category 시설비및부대비 411,500,000 KRW37.7%
-
Statistical item 시설비 411,500,000 KRW37.7%
-
Item ○작업임도 경정 155,000,000원 155,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
충청남도 예산군 · FY2025 2회 추경 · 일반회계 · 6.세출예산사업명세서(수정)
Opens in a new window
- Page
- 111 / 186
View source document details
- Document ID
doc_1qfwcxr1q19kqkjcxmgm5rvtfk- Source document status
- Available
- File type
- application/pdf
- File size
- 1,880.314 KiB
- Location inside the source
- Page 111 Row 11 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 19:02
- Read and interpreted
- 2026-07-29 19:02
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_6ed78h7ehbhgd9f6wsgjrb5n24- Address of this item
- /en/BudgetDetail/Item/bi_6ed78h7ehbhgd9f6wsgjrb5n24
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “작업임도” · classification 401-01
- ○작업임도(1km) 시설비 170,561,000원 170,561,000 KRW −34.0%
- ○작업임도(2km) 시설비 258,561,000원 258,561,000 KRW
- ○작업임도 134,741,000원 134,741,000 KRW
- ○작업임도 117,439,000원 117,439,000 KRW
- ○임도시설(작업임도 1.5km)(균특이양) 78,880,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.