- Institution
- 충청북도 청주시
- Department
- 도로시설과
◎무심동로~오창IC 도로건설공사(L=5.0km, B=17.5m)
Programme 무심동로~오창IC 도로건설(국지도96호)
Amounts and period
- Budget amount
- 7,700,000,000 KRW
- 기정액
- 8,000,000,000 KRW
- Change
- −300,000,000 KRW −3.8%
Original and supplementary budgets by year
These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.
| Year | Original budget | Supplementary 1 | Supplementary 2 | Supplementary 3 | Year-on-year change |
|---|---|---|---|---|---|
| FY2026 | 8,000,000,000 KRW | 7,700,000,000 KRW Selected | 9,700,000,000 KRW | Amount unconfirmed | −170,000,000 KRW |
| FY2025 | 1,000,000,000 KRW | 4,700,000,000 KRW | 6,870,000,000 KRW | 9,870,000,000 KRW | Not comparable |
| FY2024 | Amount unconfirmed | Amount unconfirmed | Link needs review | Amount unconfirmed | Not comparable |
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로시설과 26,530,516,000 KRW29.0%
-
Policy 광역도시 대비 역동적인 안전한 도로교통망 구축 26,486,622,000 KRW29.1%
-
Programme 주요간선 광역도로망 조기 구축 9,220,000,000 KRW83.5%
-
Project 무심동로~오창IC 도로건설(국지도96호) 8,000,000,000 KRW96.3%
-
Budget category 시설비및부대비 8,000,000,000 KRW96.3%
-
Statistical item 시설비 7,700,000,000 KRW100.0%
-
Item ◎무심동로~오창IC 도로건설공사(L=5.0km, B=17.5m) 7,700,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
◎무심동로~오창IC 도로건설공사(L=5.0km, B=17.5m ) 7,700,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
-
Open source PDF
충청북도 청주시 · FY2026 1회 추경 · 일반회계 · 건설교통국
Opens in a new window
- Page
- 5 / 10
-
Open source PDF
충청북도 청주시 · FY2026 1회 추경 · 일반회계 · 세출예산
Opens in a new window
- Page
- 141 / 323
- Document ID
doc_2b4xqpkjsns02z71fj8mqyy4yr- Source document status
- Available
- File type
- application/pdf
- File size
- 151.466 KiB
- Location inside the source
- Page 5 Row 7 Line 2 Column level4
- Document ID
doc_2mwphe11s1bp45hwez3hbtg3g3- Source document status
- Available
- File type
- application/pdf
- File size
- 3,072.212 KiB
- Location inside the source
- Page 141 Row 7 Line 2 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 19:13
- Read and interpreted
- 2026-07-29 19:13
- Query snapshot refreshed
- 2026-11-16 11:44
- Item ID
bi_6gvjcntb6dtd5fg6xyf5hes4s3- Address of this item
- /en/BudgetDetail/Item/bi_6gvjcntb6dtd5fg6xyf5hes4s3
Related records
Similar budgets
5 itemsKeyword “도로건설공사” · classification 401-01
- ◎무심동로~오창IC 도로건설공사(L=5.0km, B=17.5m) 9,700,000,000 KRW +26.0%
- ◎무심동로~오창IC 도로건설공사(L=5.0km, B=17.5m) 8,000,000,000 KRW
- ◎무심동로~오창IC 도로건설공사(L=5.0km, B=17.5m) 9,870,000,000 KRW +43.7%
- ◎무심동로~오창IC 도로건설공사(L=5.0km, B=17.5m) 1,000,000,000 KRW
- ○농어촌도로204호선(초전~벽진간)도로건설공사 1,100,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.