- Institution
- 서울특별시
- Department
- 도시교통본부 교통정책과
ㅇ 지하철 LED조명 교체
Programme 지하철 친환경 LED조명 교체
Amounts and period
- Budget amount
- Present in the source but not extracted
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Original and supplementary budgets by year
These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.
| Year | Original budget | Year-on-year change |
|---|---|---|
| FY2018 | Not provided in source Selected | Not comparable |
| FY2017 | Not provided in source | Not comparable |
| FY2016 | Not provided in source | Not comparable |
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도시교통본부 교통정책과 1,823,247,638,000 KRW
-
Policy 교통체계 구축 및 개선 821,314,248,000 KRW
-
Programme 지하철 수송력 증대 및 시설개선(도시철도특) 775,812,119,000 KRW
-
Project 지하철 친환경 LED조명 교체 291,000,000 KRW
-
Budget category 출자금 Present in the source but not extracted
-
Statistical item 출자금 Present in the source but not extracted
-
Item ㅇ 지하철 LED조명 교체 Present in the source but not extracted
- Category–statistical code
- 502-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
서울특별시 · FY2018 본예산 · 통합회계 · 5a5c0d45cc7695.16547829
Opens in a new window
- Page
- 9 / 65
- Document ID
doc_36vhzyr7c8m0c7zv2z6q3mzrh7- Source document status
- Available
- File type
- application/pdf
- File size
- 393.734 KiB
- Location inside the source
- Page 9 Row 11 Line 23 Column page_text
Source and reference
FY 2018 release No source record
- Fiscal year of record
- 2018
- Fetched from the source
- 2026-07-29 17:53
- Read and interpreted
- 2026-07-29 19:21
- Query snapshot refreshed
- 2026-11-16 11:44
- Item ID
bi_6kdr274wkchvnjsxg32qshm68e- Address of this item
- /en/BudgetDetail/Item/bi_6kdr274wkchvnjsxg32qshm68e
Related records
Similar budgets
Keyword “LED조명” · classification 502-01
No items with the same classification were found among the candidates checked.
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.