This historical collection record had an incorrect budget stage. The source confirms Main budget. The duplicate is excluded from current search; the source and history are preserved.
- Institution
- 전라남도 보성군
- Department
- 도시개발과
○도시계획도로 인도정비공사
Programme 도시계획도로 인도정비 공사
Amounts and period
- Budget amount
- 200,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도시개발과 26,873,595,000 KRW0.7%
-
Policy 도시개발 4,730,477,000 KRW4.2%
-
Programme 쾌적한 도시환경 조성 4,685,477,000 KRW4.3%
-
Project 도시계획도로 인도정비 공사 201,440,000 KRW99.3%
-
Budget category 시설비및부대비 201,440,000 KRW99.3%
-
Statistical item 시설비 200,000,000 KRW100.0%
-
Item ○도시계획도로 인도정비공사 200,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
100,000원*2,000㎡
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
- Document ID
doc_2npdh17feppah4w1wcknjexvxd- Source document status
- Available
- File type
- application/pdf
- File size
- 253.6 KiB
- Location inside the source
- Page 3 Row 5 Line 2 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-08-09 02:49
- Read and interpreted
- 2026-08-09 02:49
- Query snapshot refreshed
- 2026-11-16 11:44
- Item ID
bi_6kkmgmnjb6e3y6ytxscjmsymg0- Address of this item
- /en/BudgetDetail/Item/bi_6kkmgmnjb6e3y6ytxscjmsymg0
Related records
Similar budgets
5 itemsKeyword “도시계획도로” · classification 401-01
- ○노면불량 도시계획도로 재포장공사 1,000,000,000 KRW +33.3%
- ○내촌 도시계획도로(대로3-내촌1) 유지관리 공사 100,000,000 KRW
- ○삼산리 도시계획도로(소로1-6)정비공사 37,849,000 KRW −36.9%
- ○죽전리 도시계획도로(중로 2-11) 연결공사 189,941,000 KRW −36.7%
- ○가산 도시계획도로(중로2-가산2, 방축1리) 개설공사 400,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.