- Institution
- 강원특별자치도 속초시
- Department
- 건설과
○도로덧씌우기 공사 250,000,000원
Programme 도로시설물 안전관리
Amounts and period
- Budgeted amount
- 250,000,000 KRW
- 기정액
- 200,000,000 KRW
- Change
- +50,000,000 KRW +25.0%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 13,675,622,000 KRW1.8%
-
Policy 쾌적한도로환경 조성(수송및교통/도로) 3,414,192,000 KRW7.3%
-
Programme 안전한 도로사용을 위한 도로정비 2,877,013,000 KRW8.7%
-
Project 도로시설물 안전관리 1,389,481,000 KRW18.0%
-
Budget category 시설비및부대비 1,333,672,000 KRW18.7%
-
Statistical item 시설비 1,330,000,000 KRW18.8%
-
Item ○도로덧씌우기 공사 250,000,000원 250,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
3 itemsData source
-
Open source PDF
강원특별자치도 속초시 · FY2013 2회 추경 · 통합회계 · 2013년_2회추경예산서.
Opens in a new window
- Page
- 226 / 293
View source document details
- Document ID
doc_78xkx7n3aqhjtag4gks4gjh7tk- Source document status
- Available
- File type
- application/pdf
- File size
- 2,521.579 KiB
- Location inside the source
- Page 226 Row 25 Line 1 Column level4
Source and reference
FY 2013 release No source record
- Fiscal year of record
- 2013
- Fetched from the source
- 2026-07-29 19:58
- Read and interpreted
- 2026-07-29 19:58
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_6r1n0f6d5a94mtrnk115yabep6- Address of this item
- /en/BudgetDetail/Item/bi_6r1n0f6d5a94mtrnk115yabep6
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “도로덧씌우기” · classification 401-01
- ○도로덧씌우기 공사 200,000,000원 * 1식 200,000,000 KRW
- ○청봉로 도로덧씌우기 공사 100,000,000원 100,000,000 KRW
- ○설악산로 도로덧씌우기 공사 100,000,000원 100,000,000 KRW −50.0%
- ○설악산로 도로덧씌우기 공사 200,000,000원 200,000,000 KRW
- ○이면도로 도로덧씌우기 공사 100,000,000원 100,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.