- Institution
- 강원특별자치도 속초시
- Department
- 수질환경사업소
○최종침전지 비금속 슬러지수집기 교체(2지,7지)
Programme 하수처리장 운영
Amounts and period
- Budget amount
- 200,000,000 KRW
- 기정액
- 250,000,000 KRW
- Change
- −50,000,000 KRW −20.0%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 수질환경사업소 21,210,180,000 KRW0.9%
-
Policy 완벽한 하수처리기반 구축(환경보호/상하수도ㆍ수질) 15,167,922,000 KRW1.3%
-
Programme 하수처리 기능강화(하수도사업특별회계) 7,274,441,000 KRW2.7%
-
Project 하수처리장 운영 4,650,646,000 KRW4.3%
-
Budget category 시설비및부대비 2,269,625,000 KRW8.8%
-
Statistical item 시설비 2,269,625,000 KRW8.8%
-
Item ○최종침전지 비금속 슬러지수집기 교체(2지,7지) 200,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○최종침전지 비금속 슬러지수집기 교체(2지,7 지) 100,000,000원 * 2대
Institution and programme names are shown as the original Korean source text.
Detailed budget items
3 itemsData source
-
Open source PDF
강원특별자치도 속초시 · FY2017 3회 추경 · 통합회계 · 2017년 제3회추경예산(의결).
Opens in a new window
- Page
- 315 / 317
View source document details
- Document ID
doc_675q4eqr17nxrhgrw98bxdjt6y- Source document status
- Available
- File type
- application/pdf
- File size
- 2,573.624 KiB
- Location inside the source
- Page 315 Row 21 Line 5 Column level4
Source and reference
FY 2017 release No source record
- Fiscal year of record
- 2017
- Fetched from the source
- 2026-07-29 20:04
- Read and interpreted
- 2026-07-29 20:04
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_6ttc7ch4dje1gh99bc1kpe3mjh- Address of this item
- /en/BudgetDetail/Item/bi_6ttc7ch4dje1gh99bc1kpe3mjh
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “슬러지수집기” · classification 401-01
- ○최종침전지 비금속 슬러지수집기 교체(2지,7지) 250,000,000 KRW
- ○최초침전지 비금속 슬러지수집기 교체(4지,5지) 200,000,000 KRW −20.0%
- ○최초침전지 비금속 슬러지수집기 교체(4지,5지) 250,000,000 KRW
- ○이차침전지 슬러지수집기(비금속) 교체 140,000,000 KRW
- ○2차침전지 비금속 슬러지수집기 교체(5지) 120,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.