○공사비(L=0.7km)
Programme 금가 오석마을(리도204호선) 도로 확포장
Amounts and period
- Budgeted amount
- 400,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 32,987,398,000 KRW1.2%
-
Policy 도로건설 28,659,900,000 KRW1.4%
-
Programme 농촌도로 관리 3,520,000,000 KRW11.4%
-
Project 금가 오석마을(리도204호선) 도로 확포장 400,000,000 KRW100.0%
-
Budget category 시설비및부대비 400,000,000 KRW100.0%
-
Statistical item 시설비 400,000,000 KRW100.0%
-
Item ○공사비(L=0.7km) 400,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
충청북도 충주시 · FY2022 본예산 · 일반회계 · 2022년 당초 예산서(고시)
Opens in a new window
- Page
- 291 / 1,381
- Document ID
doc_1b708wbvmaqbzsmw7rd9wnd7xs- Source document status
- Available
- File type
- application/pdf
- File size
- 10,132.701 KiB
- Location inside the source
- Page 291 Row 16 Line 1 Column level4
Source and reference
FY 2022 release No source record
- Fiscal year of record
- 2022
- Fetched from the source
- 2026-07-29 20:23
- Read and interpreted
- 2026-07-29 20:23
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_6yb8x1bt3ftyfestcx1kg2w87w- Address of this item
- /en/BudgetDetail/Item/bi_6yb8x1bt3ftyfestcx1kg2w87w
Related records
Similar budgets
5 itemsKeyword “공사비” · classification 401-01
- ○공사비 380,000,000원 380,000,000 KRW
- ◎공사비 3,905,000,000원 3,905,000,000 KRW −5.1%
- ○공사비 935,000,000원 935,000,000 KRW
- ○ 새천년 해안도로 해파랑 감성공원 조성 공사비 2,302,000,000 KRW −17.9%
- ○공사비 478,652,000원 478,652,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.