- Institution
- 제주특별자치도
- Department
- 서귀포시도시과
○남원(소로2-44호선)도로개설사업(지방채 5억원)
Programme 남원(소로2-44호선)도로개설사업
Amounts and period
- Budgeted amount
- 500,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 서귀포시도시과 83,875,311,000 KRW0.6%
-
Policy 도시균형발전(국토및지역개발/지역및도시) 83,820,856,000 KRW0.6%
-
Programme 장기미집행 도시계획시설 정비 57,455,000,000 KRW0.9%
-
Project 남원(소로2-44호선)도로개설사업 500,000,000 KRW100.0%
-
Budget category 시설비및부대비 500,000,000 KRW100.0%
-
Statistical item 시설비 500,000,000 KRW100.0%
-
Item ○남원(소로2-44호선)도로개설사업(지방채 5억원) 500,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○남원(소로2-44호선)도로개설사업(지방채 5억 원)
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
제주특별자치도 · FY2026 본예산 · 일반회계 · (제3권)2026년도 예산서_서귀포시
Opens in a new window
- Page
- 461 / 734
- Document ID
doc_7jc0xczbkgfg3232cbdv0p35tx- Source document status
- Available
- File type
- application/pdf
- File size
- 46,657.615 KiB
- Location inside the source
- Page 461 Row 17 Line 2 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 20:39
- Read and interpreted
- 2026-07-29 20:39
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_71t7ebdmg1r8ge0v09r68888he- Address of this item
- /en/BudgetDetail/Item/bi_71t7ebdmg1r8ge0v09r68888he
Related records
Similar budgets
5 itemsKeyword “도로개설사업” · classification 401-01
- ○쇠소깍인근(소로2-6호선)도로개설사업(지방채 5억원) 500,000,000 KRW
- ○효돈(소로1-9호선)도로개설사업(지방채 5억원) 500,000,000 KRW
- ○한림주거지역 경계(소로2-24) 도로개설사업(지방채 10억원)(장기미집행) 990,000,000 KRW
- ○대정 하모지구(소로2-13호선)도로개설사업(지방채 3억원) 300,000,000 KRW
- ○화순마을안길(소로2-13호선)도로개설사업(지방채 6억원) 600,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.