- Institution
- 경기도 광명시
- Department
- 도로과
○금당마을 도로개설공사경정
Programme [주민참여예산]금당마을 도로개설사업
Amounts and period
- Budgeted amount
- 1,000,000,000 KRW
- 기정액
- 150,000,000 KRW
- Change
- +850,000,000 KRW +566.7%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 도로과 26,390,596,000 KRW3.8%
-
Policy 도로 관리 25,809,059,000 KRW3.9%
-
Programme 도로개설 공사 9,760,294,000 KRW10.2%
-
Project [주민참여예산]금당마을 도로개설사업 1,000,000,000 KRW100.0%
-
Budget category 시설비및부대비 1,000,000,000 KRW100.0%
-
Statistical item 시설비 1,000,000,000 KRW100.0%
-
Item ○금당마을 도로개설공사경정 1,000,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○금당마을 도로개설공사 경정 1,000,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
View source document details
- Document ID
doc_3h6ka0qae1t6xz44m78sqtkdmw- Source document status
- Available
- File type
- application/pdf
- File size
- 102.729 KiB
- Location inside the source
- Page 1 Row 10 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 18:55
- Read and interpreted
- 2026-07-29 18:55
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_73beywrcbqs4g74kt2jwv5ga8y- Address of this item
- /en/BudgetDetail/Item/bi_73beywrcbqs4g74kt2jwv5ga8y
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “도로개설공사경정” · classification 401-01
- ○가창 주리 10번지선 도로개설공사경정 150,000,000 KRW +400.0%
- ○역동~양벌간(중로1-14호선) 도로개설공사경정 1,630,000,000 KRW −30.6%
- ○율곡로 2719번길 일원 도로개설공사경정 300,000,000 KRW +200.0%
- ○호봉골 도로개설공사경정 2,200,000,000 KRW +46.7%
- ○목동~고산간(소로3-614호선) 도로개설공사경정 400,000,000 KRW +100.0%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.