○오라초 통학로 지중화사업(그린뉴딜)
Programme 전력지중화사업
Amounts and period
- Budgeted amount
- 141,000,000 KRW
- 기정액
- 350,000,000 KRW
- Change
- −209,000,000 KRW −59.7%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 제주시도시계획과 83,779,432,000 KRW0.2%
-
Policy 공공기반시설계획및확충 83,719,238,000 KRW0.2%
-
Programme 도시계획도로확충 19,228,320,000 KRW0.7%
-
Project 전력지중화사업 1,811,581,000 KRW7.8%
-
Budget category 시설비및부대비 1,701,129,000 KRW8.3%
-
Statistical item 시설비 1,701,129,000 KRW8.3%
-
Item ○오라초 통학로 지중화사업(그린뉴딜) 141,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
-
Open source PDF
제주특별자치도 · FY2024 2회 추경 · 통합회계 · ★2024년 제2회 추경 세입·세출 예산서(공지용)
Opens in a new window
- Page
- 469 / 965
View source document details
- Document ID
doc_0gjnd9hf9v1nrnydc12hsb5rvb- Source document status
- Available
- File type
- application/pdf
- File size
- 36,879.974 KiB
- Location inside the source
- Page 469 Row 11 Line 3 Column level4
Source and reference
FY 2024 release No source record
- Fiscal year of record
- 2024
- Fetched from the source
- 2026-07-29 20:30
- Read and interpreted
- 2026-07-29 20:30
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_75dwpyhrvrx52jzf6k28xhx61n- Address of this item
- /en/BudgetDetail/Item/bi_75dwpyhrvrx52jzf6k28xhx61n
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “지중화사업” · classification 401-01
- ○오라초 통학로 지중화사업(그린뉴딜) 150,000,000 KRW
- ○오라초 통학로 지중화사업(그린뉴딜) 209,000,000 KRW
- ○동광초 통학로 지중화사업(그린뉴딜) 100,000,000 KRW
- ○중앙초 통학로 지중화사업(그린뉴딜) 150,000,000 KRW
- ○동광초 통학로 지중화사업(그린뉴딜) 100,000,000 KRW −66.7%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.