- Institution
- 인천광역시 강화군
- Department
- 하점면
○부근1리 마을안길 재포장공사(L=900m, B=5.5m)
Programme 마을안길(농로) 정비
Amounts and period
- Budgeted amount
- 75,000,000 KRW
- 기정액
- 0 KRW
- Change
- +75,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 하점면 2,051,519,000 KRW3.7%
-
Policy 하점면 사업경비 1,852,751,000 KRW4.0%
-
Programme 지역사회개발 1,261,000,000 KRW5.9%
-
Project 마을안길(농로) 정비 265,000,000 KRW28.3%
-
Budget category 시설비및부대비 265,000,000 KRW28.3%
-
Statistical item 시설비 265,000,000 KRW28.3%
-
Item ○부근1리 마을안길 재포장공사(L=900m, B=5.5m) 75,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○부근1리 마을안길 재포장공사(L=900m, B=5.5m ) 75,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
3 itemsData source
- Document ID
doc_6n6ng0nvwka59vtsc53qd5aq2a- Source document status
- Available
- File type
- application/pdf
- File size
- 1,987.667 KiB
- Location inside the source
- Page 131 Row 21 Line 3 Column level4
Source and reference
FY 2020 release No source record
- Fiscal year of record
- 2020
- Fetched from the source
- 2026-07-29 18:10
- Read and interpreted
- 2026-07-29 18:10
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_788gzv5fcvbe8388yekjt0awnb- Address of this item
- /en/BudgetDetail/Item/bi_788gzv5fcvbe8388yekjt0awnb
Related records
Similar budgets
5 itemsKeyword “재포장공사” · classification 401-01
- ○이강3리(284-1번지 일원) 마을안길 재포장공사(L=340m,B=3m) 경정 0 KRW −100.0%
- ○고천5리(1582-2번지 일원) 아스콘 재포장공사 (L=900m,B=4m) 100,000,000 KRW
- ○이강3리(284-1번지 일원) 마을안길 재포장공사(L=340m,B=3m) 40,000,000 KRW
- ○신현리(353-3번지 일원) 마을안길 재포장공사(L=25m,B=4m) 22,000,000 KRW
- ○창2리(16-2번지 일원) 마을안길 재포장공사(L =300m,B=3m) 30,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.