- Institution
- 강원특별자치도 원주시
- Department
- 봉산동
○화실 우수배수시설 설치공사(L=120m,B=0.5m)
Programme 봉산동 소규모 주민숙원사업
Amounts and period
- Budget amount
- 30,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 봉산동 502,428,000 KRW6.0%
-
Policy 봉산동사업경비 306,451,000 KRW9.8%
-
Programme 봉산동 소규모 주민숙원사업 306,451,000 KRW9.8%
-
Project 봉산동 소규모 주민숙원사업 301,080,000 KRW10.0%
-
Budget category 시설비및부대비 301,080,000 KRW10.0%
-
Statistical item 시설비 300,000,000 KRW10.0%
-
Item ○화실 우수배수시설 설치공사(L=120m,B=0.5m) 30,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
30,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
10 items- ○화실 우수배수시설 설치공사(L=120m,B=0.5m) 30,000,000 KRW Opens in a new window
- ○해바라기농장 앞 마을안길 아스콘 포장공사(L =700m,B=4m) 55,000,000 KRW Opens in a new window
- ○절골 농로 콘크리트 포장공사(L=150m,B=1.5m) 15,000,000 KRW Opens in a new window
- ○능골 전석쌓기 공사(L=40m) 15,000,000 KRW Opens in a new window
- ○삼복골 농수로 정비공사(L=150m) 45,000,000 KRW Opens in a new window
- ○황문터 농수로 정비공사(L=150m) 45,000,000 KRW Opens in a new window
- ○유세골 농수로 정비공사(L=150m) 45,000,000 KRW Opens in a new window
- ○화실경로당 앞 농수로 정비공사(L=100m) 30,000,000 KRW Opens in a new window
- ○17통 웰마트 옆 아스콘 덧씌우기 공사(L=120m,B=4m) 20,000,000 KRW Opens in a new window
- ○시설부대비 300,000,000원*0.72/100*0.5 1,080,000 KRW Opens in a new window
Data source
View source document details
- Document ID
doc_15ktrzenbkbyq6qzzfpghdxrhw- Source document status
- Available
- File type
- application/pdf
- File size
- 111.78 KiB
- Location inside the source
- Page 2 Row 14 Line 13 Column level4
Source and reference
FY 2013 release No source record
- Fiscal year of record
- 2013
- Fetched from the source
- 2026-07-29 17:21
- Read and interpreted
- 2026-07-29 17:21
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_79vgef2dpcq5j6k0sdce70yd53- Address of this item
- /en/BudgetDetail/Item/bi_79vgef2dpcq5j6k0sdce70yd53
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “우수배수시설” · classification 401-01
AI analysis report
AI analysis reports are not yet available.