- Institution
- 충청북도 옥천군
- Department
- 산림녹지과
◎임도시설(사전설계비)(L=2.0km)
Programme 임도시설(보조)
Amounts and period
- Budget amount
- 20,080,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 산림녹지과 17,251,912,000 KRW0.1%
-
Policy 산림자원보호 3,227,407,000 KRW0.6%
-
Programme 임도사업 874,692,000 KRW2.3%
-
Project 임도시설(보조) 813,163,000 KRW2.5%
-
Budget category 시설비및부대비 813,163,000 KRW2.5%
-
Statistical item 시설비 795,428,000 KRW2.5%
-
Item ◎임도시설(사전설계비)(L=2.0km) 20,080,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
7 items- ◎임도시설(사전설계비)(L=2.0km) 20,080,000 KRW Opens in a new window
- ◎임도신설(간선임도)(L=2.0km) 428,265,000 KRW Opens in a new window
- ◎임도신설(작업임도)(L=2.0km) 270,000,000 KRW Opens in a new window
- ◎임도신설(구조개량)(L=1.0km) 68,000,000 KRW Opens in a new window
- ◎임도시설(보수)(L=2.0km) 9,083,000 KRW Opens in a new window
- ◎임도신설 감리비 12,833,000 KRW Opens in a new window
- ◎임도시설 시설부대비 4,902,000 KRW Opens in a new window
Data source
-
Open source PDF
충청북도 옥천군 · FY2019 본예산 · 일반회계 · 사업명세서 일반회계 본청 산림녹지과(세출예산서)
Opens in a new window
- Page
- 21 / 34
View source document details
- Document ID
doc_1sb7myy9jr6p37gvh6tv9cs5zb- Source document status
- Available
- File type
- application/pdf
- File size
- 480.368 KiB
- Location inside the source
- Page 21 Row 2 Line 3 Column level4
Source and reference
FY 2019 release No source record
- Fiscal year of record
- 2019
- Fetched from the source
- 2026-07-29 18:03
- Read and interpreted
- 2026-07-29 18:03
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_7fxg6fe9eydessbnwadzmjmnj2- Address of this item
- /en/BudgetDetail/Item/bi_7fxg6fe9eydessbnwadzmjmnj2
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “사전설계비” · classification 401-01
- ○임도시설 사전설계비(3.0km) 30,120,000 KRW
- ○임도보수(작업임도) 사전설계비 20,000,000 KRW
- ◎사전설계비 10,000,000원*2km 20,000,000 KRW
- ○ 임도사업 사전설계비 30,000,000 KRW
- ○ 사전설계비 30,000,000원*1식 30,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.