- Institution
- 경기도 수원시
- Department
- 재난대응과
○2025년 여름철 우기대비 관로준설(특교)(성립전 1차)
Programme 2025년 여름철 우기대비 관로준설
Amounts and period
- Budgeted amount
- 165,000,000 KRW
- 기정액
- 0 KRW
- Change
- +165,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 재난대응과 19,700,459,000 KRW0.8%
-
Policy 재난예방 및 복구능력 강화 3,877,605,000 KRW4.3%
-
Programme 재난관리체계 구축 3,771,237,000 KRW4.4%
-
Project 2025년 여름철 우기대비 관로준설 165,000,000 KRW100.0%
-
Budget category 시설비및부대비 165,000,000 KRW100.0%
-
Statistical item 시설비 165,000,000 KRW100.0%
-
Item ○2025년 여름철 우기대비 관로준설(특교)(성립전 1차) 165,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○2025년 여름철 우기대비 관로준설(특교)(성 립전 1차) 165,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경기도 수원시 · FY2025 Supplementary budget (round unknown) · 통합회계 · Expenditure statement
Opens in a new window
- Page
- 86 / 149
- Document ID
doc_78302amp3vaj3s63ar3j882dt3- Source document status
- Available
- File type
- application/pdf
- File size
- 2,788.64 KiB
- Location inside the source
- Page 86 Row 7 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 20:31
- Read and interpreted
- 2026-07-29 20:31
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_7ns95302ncmb07r2djre1jmnyg- Address of this item
- /en/BudgetDetail/Item/bi_7ns95302ncmb07r2djre1jmnyg
Related records
Similar budgets
5 itemsKeyword “우기대비” · classification 401-01
- ○2025년 우기대비 빗물받이 정비(특교)(성립전 1차) 350,000,000 KRW
- ○25년 여름철 우기대비 관로준설(재난특교세)(성립전) 138,000,000 KRW
- ○ 여름철 우기대비 관로준설(하수도 정비)(성립전) 40,000,000 KRW
- ○25년 포천시 여름철 우기대비 관로준설 공사(성립전4차) 131,000,000 KRW
- ○2025년 우기대비 빗물받이 정비(준설,청소, 교체 등)(성립전 예산) 100,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.