- Institution
- 경상남도 양산시
- Department
- 웅상출장소도시건설과
○명동도시계획도로(소2-74호선)개설공사
Programme 명동도시계획도로(소2-74호선) 개설
Amounts and period
- Budget amount
- 44,030,000 KRW
- 기정액
- 54,000,000 KRW
- Change
- −9,970,000 KRW −18.5%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 웅상출장소도시건설과 40,448,041,000 KRW0.1%
-
Policy 도로망 구축 28,915,203,000 KRW0.2%
-
Programme 도시계획도로 개설 28,915,203,000 KRW0.2%
-
Project 명동도시계획도로(소2-74호선) 개설 44,030,000 KRW100.0%
-
Budget category 시설비및부대비 44,030,000 KRW100.0%
-
Statistical item 시설비 44,030,000 KRW100.0%
-
Item ○명동도시계획도로(소2-74호선)개설공사 44,030,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
-
Open source PDF
경상남도 양산시 · FY2019 3회 추경 · 일반회계 · 2019년 3회추경 예산서 14-4
Opens in a new window
- Page
- 1 / 4
View source document details
- Document ID
doc_4wx3pymzhgb1bq5cbnw7e36wyw- Source document status
- Available
- File type
- application/pdf
- File size
- 124.204 KiB
- Location inside the source
- Page 1 Row 8 Line 1 Column level4
Source and reference
FY 2019 release No source record
- Fiscal year of record
- 2019
- Fetched from the source
- 2026-07-29 12:02
- Read and interpreted
- 2026-07-29 12:02
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_7rjwpdha3k23z4hbtzav0f42xx- Address of this item
- /en/BudgetDetail/Item/bi_7rjwpdha3k23z4hbtzav0f42xx
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “명동도시계획도로” · classification 401-01
- ○명동도시계획도로(소2-74호선)개설공사 54,000,000 KRW
- ○명동도시계획도로(소2-74호선)개설공사 54,000,000 KRW
- ○명동도시계획도로(소2-74호선)개설공사 54,000,000 KRW
- ○명동도시계획도로(소2-74호선) 개설공사 200,000,000 KRW
- ○명동도시계획도로(소2-74호선)개설공사 25,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.