- Institution
- 전라남도 광양시
- Department
- 중마동
○파라다이스모텔 옆 보행자도로정비공사(L=54m,B=6.0m)
Programme 주민숙원사업
Amounts and period
- Budgeted amount
- 15,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 중마동 619,778,000 KRW2.4%
-
Policy 중마동주민생활 편익 증진 506,969,000 KRW3.0%
-
Programme 생활환경정비 267,820,000 KRW5.6%
-
Project 주민숙원사업 176,260,000 KRW8.5%
-
Budget category 시설비및부대비 176,260,000 KRW8.5%
-
Statistical item 시설비 175,000,000 KRW8.6%
-
Item ○파라다이스모텔 옆 보행자도로정비공사(L=54m,B=6.0m) 15,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○파라다이스모텔 옆 보행자도로정비공사(L=54m ,B=6.0m) 15,000,000
Institution and programme names are shown as the original Korean source text.
Detailed budget items
9 items- ○파라다이스모텔 옆 보행자도로정비공사(L=54m,B=6.0m) 15,000,000 KRW Opens in a new window
- ○진등길 일원 배수시설 정비공사 10,000,000 10,000,000 KRW Opens in a new window
- ○마흘마을 주차장 배수로 정비공사(L=50m) 10,000,000 KRW Opens in a new window
- ○커뮤니센터 인근 소공원 정비공사 30,000,000 KRW Opens in a new window
- ○두부마을 인근 보도 탄성포장공사(L=380m,B=1.7m) 30,000,000 KRW Opens in a new window
- ○범등산장 인근 보도 탄성포장공사(L=300m,B=1.7m) 24,000,000 KRW Opens in a new window
- ○가야로 2주차장 인근보도 탄성포장공사(L=330m,B=1.7m) 26,000,000 KRW Opens in a new window
- ○현충탑 주차장 보행자도로 정비공사(L=150m,B =5.5m) 30,000,000 KRW Opens in a new window
- ○시설부대비 175,000,000*0.72% 1,260,000 KRW Opens in a new window
Data source
- Document ID
doc_079yajamv3pw056x1pfk1ga1gk- Source document status
- Available
- File type
- application/pdf
- File size
- 86.941 KiB
- Location inside the source
- Page 5 Row 11 Line 4 Column level4
Source and reference
FY 2010 release No source record
- Fiscal year of record
- 2010
- Fetched from the source
- 2026-07-28 21:45
- Read and interpreted
- 2026-07-28 21:45
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_7v0qb56mvddfwa2fwymwep8a8d- Address of this item
- /en/BudgetDetail/Item/bi_7v0qb56mvddfwa2fwymwep8a8d
Related records
Similar budgets
Keyword “보행자도로정비공사” · classification 401-01
No items with the same classification were found among the candidates checked.
AI analysis report
AI analysis reports are not yet available.